Revision history of "Reconstruction of the strategic collective transport corridor with the purchase of rolling stock in the central part of the LOF area" (Q88455)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:5015:50, 13 October 2024DG Regio talk contribs 74,540 bytes −1 Changed label, description and/or aliases in pt
  • curprev 15:5015:50, 13 October 2024DG Regio talk contribs 74,541 bytes +52 Set a claim value: summary (P836): O projeto tem por objeto: 1. Requalificação/expansão das ruas: —Al.Racławicki-da rotunda de sangues honorários (incluindo a rotunda) até à intersecção com a Lipowa Street, -ul. Poniatowski – de Al.Racławicki até ao viaduto por cima da Avenida Solidarności, -ul. Sowińskiego – de Al.Racławicki até à intersecção com a rua Głęboka, -ul. Profundo – desde o posto de gasolina até à intersecção com a Philaret Street, -ul. Lipowa – desde o cruzamento com a A...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

26 October 2022

20 October 2022

13 August 2022

  • curprev 17:4717:47, 13 August 2022DG Regio talk contribs 71,241 bytes +45,677 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

16 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:4821:48, 30 November 2021DG Regio talk contribs 15,580 bytes +2,352 Created claim: summary (P836): L’objet du projet est: 1. Reconstruction/extension des rues: —Al.Racławickie-du rond-point des donneurs honoraires (avec le rond-point) à la jonction avec ul.Lipowa, -ul. Poniatowski — d’Al. Racławicki au viaduc sur l’avenue Solidarité, -ul. Sowiński — de Al.Racławickie à l’intersection avec la rue Głęboka, -ul. Profond — de la station-service à la jonction avec ul.Filaretów, -ul. Lipowa — de l’intersection avec Al.Racławicki à la jonction avec...
  • curprev 21:4821:48, 30 November 2021DG Regio talk contribs 13,228 bytes +197 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:4215:42, 14 October 2020DG Regio talk contribs 13,471 bytes +192 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:4215:42, 14 October 2020DG Regio talk contribs 13,279 bytes −193 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:4215:42, 14 October 2020DG Regio talk contribs 13,472 bytes +2,203 Created claim: summary (P836): The subject of the project is: 1. Redevelopment/expansion of streets: —Al.Racławicki-from the Roundabout of Honorary Bloods (including the roundabout) to the intersection with Lipowa Street, -ul. Poniatowski – from Al.Racławicki to the viaduct above Solidarności Avenue, -ul. Sowińskiego – from Al.Racławicki to the intersection with Głęboka Street, -ul. Deep – from the gas station to the intersection with Philaret Street, -ul. Lipowa – from the j...
  • curprev 15:4215:42, 14 October 2020DG Regio talk contribs 11,269 bytes −1,657 Removed claim: summary (P836): The project involves:1.Street reconstruction/development:— Al.Racławich-from Ronda Honor Honour (with a roundabout) to the junction with ul.Lipowe, -ul.Poniatowski — from Al.Racławice to a viaduct over the al.Solidarność, -ul.Sowiński — from Al.Racławice to the junction with ul.Ostrołęka, -ul.Deep from the petrol station to the junction with the ul.Film, -ul.Form — from the junction with Al.Racławice to the junction with ul.Narutowicz includin...

23 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:3710:37, 4 March 2020DG Regio talk contribs 11,649 bytes +1,657 Created claim: summary (P836): The project involves:1.Street reconstruction/development:— Al.Racławich-from Ronda Honor Honour (with a roundabout) to the junction with ul.Lipowe, -ul.Poniatowski — from Al.Racławice to a viaduct over the al.Solidarność, -ul.Sowiński — from Al.Racławice to the junction with ul.Ostrołęka, -ul.Deep from the petrol station to the junction with the ul.Film, -ul.Form — from the junction with Al.Racławice to the junction with ul.Narutowicz including....

18 February 2020

8 February 2020

31 January 2020

14 January 2020