Revision history of "Increase in design management potential at HYDROTECH" (Q88252)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2906:29, 13 October 2024DG Regio talk contribs 83,863 bytes −13 Changed label, description and/or aliases in pt
  • curprev 06:2906:29, 13 October 2024DG Regio talk contribs 83,876 bytes +24 Set a claim value: summary (P836): O objetivo do projeto é realizar uma auditoria de conceção e desenvolver uma estratégia de conceção para os produtos oferecidos pela HYDROTECH e, a mais longo prazo, introduzir novos produtos na oferta da recorrente. O tema da auditoria de projeto será o nó de concreto e, acima de tudo, as misturadoras de concreto de duas paredes e planetárias, que são o coração de toda a instalação. Os outros elementos do nó também serão sujeitos a uma auditoria de...

22 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4522:45, 2 March 2023DG Regio talk contribs 81,458 bytes +276 Changed label, description and/or aliases in da, sk, lv, it, bg, et, ga, ro, fi, sv, nl, lt, es, pt, sl, hu, fr, de, el, cs, hr, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

13 August 2022

  • curprev 17:4517:45, 13 August 2022DG Regio talk contribs 79,072 bytes +50,960 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:4821:48, 30 November 2021DG Regio talk contribs 16,725 bytes +2,902 Created claim: summary (P836): L’objectif du projet est de réaliser un audit de conception et d’élaborer une stratégie de conception pour les produits proposés par HYDROTECH et, à long terme, d’introduire de nouveaux produits dans l’offre de la requérante. L’objet de l’audit de conception sera un nœud en béton, et surtout des mélangeurs de béton à double puits et planétaires, qui est le cœur de l’ensemble de l’installation. Les autres éléments du nœud feront également l’objet...
  • curprev 21:4821:48, 30 November 2021DG Regio talk contribs 13,823 bytes +124 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:4515:45, 14 October 2020DG Regio talk contribs 14,139 bytes +111 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:4515:45, 14 October 2020DG Regio talk contribs 14,028 bytes −127 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:4515:45, 14 October 2020DG Regio talk contribs 14,155 bytes +2,593 Created claim: summary (P836): The aim of the project is to carry out a design audit and develop a design strategy for products offered by HYDROTECH, and in the longer term to introduce new products to the applicant’s offer. The subject of the design audit will be the concrete node, and above all the two-walled and planetary concrete mixers, which is the heart of the entire installation. The other elements of the node will also be subject to a design audit. The Institute of I...
  • curprev 15:4515:45, 14 October 2020DG Regio talk contribs 11,562 bytes −2,137 Removed claim: summary (P836): The aim of the project is to carry out an audit of the design and design of a design strategy for the products offered by HYDROTECH and, in the longer term, to introduce new products in the Applicant’s bid.The design of the concrete system will be the one which will be the subject of an audit, and, above all, a two-pipe and plant mixer, which is the heart of the installation as a whole.The other elements of the node will also be subject to the...

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:3310:33, 4 March 2020DG Regio talk contribs 12,408 bytes +2,137 Created claim: summary (P836): The aim of the project is to carry out an audit of the design and design of a design strategy for the products offered by HYDROTECH and, in the longer term, to introduce new products in the Applicant’s bid.The design of the concrete system will be the one which will be the subject of an audit, and, above all, a two-pipe and plant mixer, which is the heart of the installation as a whole.The other elements of the node will also be subject to the d...

18 February 2020

8 February 2020

31 January 2020

14 January 2020