Revision history of "Model strategy as a tool for increasing the competitiveness of the Product and Trade Company “LUKS”" (Q88044)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2822:28, 12 October 2024DG Regio talk contribs 90,301 bytes −1 Changed label, description and/or aliases in pt
  • curprev 22:2822:28, 12 October 2024DG Regio talk contribs 90,302 bytes −57 Set a claim value: summary (P836): A auditoria de conceção será realizada no período compreendido entre 1 de abril de 2018 e 31 de julho de 2018, em duas fases: 1. Modelo de análise das atividades da recorrente. 2. Elaboração da estratégia de conceção do requerente. Um total de 40 dias úteis. A primeira fase terá a duração de 25 dias úteis e, por parte do contratante responsável pela sua execução, será: Elżbieta Rozbicka e Joanna Oziemblewska. A segunda fase terá uma duração de 15 di...

20 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 16:3316:33, 2 March 2023DG Regio talk contribs 87,965 bytes +822 Changed label, description and/or aliases in lv, da, fr, ro, it, sk, bg, hr, et, sl, de, lt, ga, fi, nl, sv, es, hu, mt, el, pt, cs, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 05:3105:31, 26 July 2022DG Regio talk contribs 85,040 bytes +55,299 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 22:0722:07, 30 November 2021DG Regio talk contribs 17,309 bytes +3,077 Created claim: summary (P836): L’audit de conception se déroulera entre le 1er avril 2018 et le 31 juillet 2018, en deux étapes: 1. Analyse de la conception des activités de la requérante. 2. Élaboration de la stratégie de conception de la requérante. Un total de 40 jours ouvrables. La première phase durera 25 jours ouvrables, de la part du contractant responsable de sa mise en œuvre: Elżbieta Rozbicka et Joanna Oziemblewska. La deuxième phase durera 15 jours ouvrables et le...
  • curprev 22:0722:07, 30 November 2021DG Regio talk contribs 14,232 bytes +194 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:2515:25, 14 October 2020DG Regio talk contribs 14,478 bytes +163 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:2515:25, 14 October 2020DG Regio talk contribs 14,315 bytes −148 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:2515:25, 14 October 2020DG Regio talk contribs 14,463 bytes +2,818 Created claim: summary (P836): The design audit will be carried out in the period from 1 April 2018 to 31 July 2018, in two stages: 1. Model analysis of the applicant’s activities. 2. Development of the Applicant’s Design Strategy. A total of 40 working days. The first phase will last 25 working days, on the part of the Contractor responsible for its implementation will be: Elżbieta Rozbicka and Joanna Oziemblewska. The second stage will last 15 working days, and the Contract...
  • curprev 15:2515:25, 14 October 2020DG Regio talk contribs 11,645 bytes −2,296 Removed claim: summary (P836): A model audit will be carried out over the period from 1 April 2018 to 31 July 2018 in two stages:1.Analysis of the Applicant’s activities.2.Drawing up the applicant’s design strategy.40 working days in total.The first phase will last 25 working days, and the Contractor will be responsible for:Elzbieta Rozicka and Joanna Oterrestrial.The second phase will last 15 working days and, on the part of the Contractor, Elżbieta Rozicka and Joanna Oter...

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:2210:22, 4 March 2020DG Regio talk contribs 12,650 bytes +2,296 Created claim: summary (P836): A model audit will be carried out over the period from 1 April 2018 to 31 July 2018 in two stages:1.Analysis of the Applicant’s activities.2.Drawing up the applicant’s design strategy.40 working days in total.The first phase will last 25 working days, and the Contractor will be responsible for:Elzbieta Rozicka and Joanna Oterrestrial.The second phase will last 15 working days and, on the part of the Contractor, Elżbieta Rozicka and Joanna Oterre...

18 February 2020

8 February 2020

31 January 2020

14 January 2020