Revision history of "Introduction of innovations through the implementation of recommendations resulting from the design strategy of ARTPOL-Therm Sp. z o.o." (Q87961)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2822:28, 12 October 2024DG Regio talk contribs 91,214 bytes −2 Changed label, description and/or aliases in pt
  • curprev 22:2822:28, 12 October 2024DG Regio talk contribs 91,216 bytes −21 Set a claim value: summary (P836): O PROJETO IRÁ APLICAR TODAS AS ESTRATÉGIAS DE CONCEÇÃO RESULTANTES DESENVOLVIDAS NA FASE E AS SEGUINTES RECOMENDAÇÕES: Recomendação 1 Introdução à produção de novos permutadores de calor para instalações solares e de piscinas para clientes individuais (mercado B2C) Atividades: Aquisição de: conceção de novos permutadores de calor para instalações solares e de piscinas para clientes individuais (mercado B2C); um projeto de estratégia de comercializaç...

20 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4422:44, 2 March 2023DG Regio talk contribs 88,844 bytes −386 Changed label, description and/or aliases in da, it, sk, lv, ga, ro, et, sl, sv, fi, cs, mt, de, hr, lt, el, es, bg, hu, pt, fr, nl, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 05:2605:26, 26 July 2022DG Regio talk contribs 87,112 bytes +56,793 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 22:0022:00, 30 November 2021DG Regio talk contribs 17,569 bytes +3,191 Created claim: summary (P836): DANS LE CADRE DE LA MISE EN ŒUVRE DU PROJET, TOUS LES RÉSULTATS DE LA STRATÉGIE DE CONCEPTION ÉLABORÉE À L’ÉTAPE ET LES RECOMMANDATIONS SUIVANTES SERONT MISES EN ŒUVRE: Recommandation 1 Introduction à la production de nouveaux échangeurs de chaleur pour installations solaires et piscines pour les clients individuels (marché B2C) Activités: Achat de: la conception de nouveaux échangeurs de chaleur pour installations solaires et piscines pour les...
  • curprev 22:0022:00, 30 November 2021DG Regio talk contribs 14,378 bytes +178 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1115:11, 14 October 2020DG Regio talk contribs 14,640 bytes +195 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1115:11, 14 October 2020DG Regio talk contribs 14,445 bytes −189 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1115:11, 14 October 2020DG Regio talk contribs 14,634 bytes +2,769 Created claim: summary (P836): THE PROJECT WILL IMPLEMENT ALL THE RESULTING DESIGN STRATEGIES DEVELOPED IN THE PHASE AND THE FOLLOWING RECOMMENDATIONS: Recommendation 1 Introduction to the production of new heat exchangers for solar and swimming pool installations for individual customers (B2C market) Activities: Purchase of: design of new heat exchangers for solar and pool installations for individual customers (B2C market); a project of marketing strategy for the introducti...
  • curprev 15:1115:11, 14 October 2020DG Regio talk contribs 11,865 bytes −2,234 Removed claim: summary (P836): AS PART OF THE IMPLEMENTATION OF THE PROJECT, ALL THE RESULTS OF THE DESIGN STRATEGY DEVELOPED IN THE PHASE AND THE FOLLOWING RECOMMENDATIONS WILL BE MADE:Recommendation 1 Introduction to the manufacture of new heat exchangers to solar and swimming pool installations (B2C market) Activities:Purchase:the design of new heat exchangers to solar and swimming pool installations (B2C market);a draft marketing strategy for the introduction into the B...

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:2310:23, 4 March 2020DG Regio talk contribs 12,819 bytes +2,234 Created claim: summary (P836): AS PART OF THE IMPLEMENTATION OF THE PROJECT, ALL THE RESULTS OF THE DESIGN STRATEGY DEVELOPED IN THE PHASE AND THE FOLLOWING RECOMMENDATIONS WILL BE MADE:Recommendation 1 Introduction to the manufacture of new heat exchangers to solar and swimming pool installations (B2C market) Activities:Purchase:the design of new heat exchangers to solar and swimming pool installations (B2C market);a draft marketing strategy for the introduction into the B2C...

18 February 2020

8 February 2020

31 January 2020

14 January 2020