Revision history of "Implementation of R & D results by launching the production of go-kart with electric drive and interchangeable power system" (Q87852)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 13:1513:15, 2 March 2023DG Regio talk contribs 89,504 bytes +2,689 Changed label, description and/or aliases in fr, it, da, bg, sk, cs, et, ga, fi, pt, es, el, de, mt, nl, hr, lt, hu, sl, sv, lv, ro, and other parts

27 October 2022

26 October 2022

21 October 2022

26 July 2022

  • curprev 05:1805:18, 26 July 2022DG Regio talk contribs 84,699 bytes +54,607 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:4721:47, 30 November 2021DG Regio talk contribs 17,386 bytes +3,104 Created claim: summary (P836): Les RÉSULTATS DE RÉSULTATS DE REQUIREMENT-ROVAL TRAVAILS concernent le développement d’une conception innovante d’un go-kart électrique avec un système d’alimentation interchangeable. Les études INDUSTRIELLEs comprenaient: —développement d’une solution d’entraînement électrique go-kart — sélection du type de moteur — assorti d’une source électrochimique efficace — développement de la commande go-card — développement d’un cadre go-card — développ...
  • curprev 21:4721:47, 30 November 2021DG Regio talk contribs 14,282 bytes +218 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5714:57, 14 October 2020DG Regio talk contribs 14,504 bytes +183 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5714:57, 14 October 2020DG Regio talk contribs 14,321 bytes −200 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5714:57, 14 October 2020DG Regio talk contribs 14,521 bytes +2,659 Created claim: summary (P836): The research and processing work held by the applicant relates to the development of an innovative design of an electric go-kart with an interchangeable power system. Pre-SPEAKING studies included: —development of the go-kart electric drive solution – selecting the engine type – matching an efficient electrochemical source – development of go-kart control -development of the go-kart frame -development of an innovative crossover node -creation of...
  • curprev 14:5714:57, 14 October 2020DG Regio talk contribs 11,862 bytes −2,295 Removed claim: summary (P836): The R & D R & D carried out by the applicant is related to the development of an innovative gas-art design with an interchangeable power supply system.INDUSTRIAL testing included:— development of a solution for electric propulsion of the gocta — fitting of an engine type -sizing of an efficient electrochemical source -developing a gkart -frame for the development of a gkarta framework -frame for the development of an innovative switch -junctio...

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1910:19, 4 March 2020DG Regio talk contribs 12,866 bytes +2,295 Created claim: summary (P836): The R & D R & D carried out by the applicant is related to the development of an innovative gas-art design with an interchangeable power supply system.INDUSTRIAL testing included:— development of a solution for electric propulsion of the gocta — fitting of an engine type -sizing of an efficient electrochemical source -developing a gkart -frame for the development of a gkarta framework -frame for the development of an innovative switch -junction...

18 February 2020

8 February 2020

31 January 2020

14 January 2020