Revision history of "Preparing Tom-par to implement a new business model related to the internationalisation of activities." (Q87791)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2722:27, 12 October 2024DG Regio talk contribs 61,022 bytes −8 Changed label, description and/or aliases in pt
  • curprev 22:2722:27, 12 October 2024DG Regio talk contribs 61,030 bytes +154 Set a claim value: summary (P836): Trabalho NAD MBI Tempo de trabalho: 95 horas de trabalho no período de 10.8.2018 a 30.8.2018. Método de execução do trabalho: O consultor externo (OEG) implementou plenamente o novo instrumento de mercado, com base em consultas com Tom-par. O trabalho foi realizado através de um inquérito de autodiagnóstico, investigação documental, brainstorming, árvore de problemas, entrevistas aprofundadas, seminários, etc. No âmbito do trabalho, foram realizadas...

20 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4422:44, 2 March 2023DG Regio talk contribs 58,121 bytes −457 Changed label, description and/or aliases in lv, it, sk, da, ro, ga, fi, es, pt, et, lt, sv, hr, fr, el, nl, hu, sl, cs, bg, de, mt, and other parts

21 October 2022

26 July 2022

  • curprev 05:1305:13, 26 July 2022DG Regio talk contribs 57,766 bytes +35,557 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:3721:37, 30 November 2021DG Regio talk contribs 14,873 bytes +1,841 Created claim: summary (P836): Travail NAD MBI Temps de travail: 95 heures-homme dans la période 10.08.2018-30.08.2018 Le conseiller externe (OEG) a pleinement mis en œuvre le nouvel IRM, en se fondant sur des consultations avec le TDM-PaR. Les travaux ont été réalisés au moyen d’une enquête sur l’autodiagnostic, la recherche documentaire, le remue-méninges, l’arborescence des problèmes, des entretiens approfondis, des ateliers, etc. Dans le cadre des travaux, des réunions on...
  • curprev 21:3721:37, 30 November 2021DG Regio talk contribs 13,032 bytes +179 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5614:56, 14 October 2020DG Regio talk contribs 13,293 bytes +162 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5614:56, 14 October 2020DG Regio talk contribs 13,131 bytes −144 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5614:56, 14 October 2020DG Regio talk contribs 13,275 bytes +1,677 Created claim: summary (P836): Work NAD MBI Work time: 95 working hours in the period 10.08.2018-30.08.2018. Method of carrying out work: The External Advisor (OEG) has fully implemented the new MBI, based on consultations with Tom-par. The work was carried out by means of an auto-diagnosis survey, desk research, brainstorming, problem tree, in-depth interviews, workshops, etc. As part of the work, meetings were held at the company headquarters, numerous teleconferences, tele...
  • curprev 14:5614:56, 14 October 2020DG Regio talk contribs 11,598 bytes −953 Removed claim: summary (P836): The work of the NAD MBI:95 man-hours for the period 10.08.2018-30.08.2018: how to do the work:The external adviser (OEG) fully implemented the new MBI based on the consultation of ToM-PR.The works were carried out by means of a self-analysis survey, a search for research, brainstorming, problem tree, in-depth interviews, workshop work, etc.As part of the work, meetings have taken place in the premises of the company, numerous teleconferences,...

16 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:4010:40, 4 March 2020DG Regio talk contribs 10,835 bytes +953 Created claim: summary (P836): The work of the NAD MBI:95 man-hours for the period 10.08.2018-30.08.2018: how to do the work:The external adviser (OEG) fully implemented the new MBI based on the consultation of ToM-PR.The works were carried out by means of a self-analysis survey, a search for research, brainstorming, problem tree, in-depth interviews, workshop work, etc.As part of the work, meetings have taken place in the premises of the company, numerous teleconferences, te...

18 February 2020

8 February 2020

31 January 2020

14 January 2020