Revision history of "Preparation for the implementation of ATLIBRON’s business model of internationalisation" (Q87702)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2722:27, 12 October 2024DG Regio talk contribs 82,146 bytes −1 Changed label, description and/or aliases in pt
  • curprev 22:2722:27, 12 October 2024DG Regio talk contribs 82,147 bytes +147 Set a claim value: summary (P836): Trabalho NAD MBI Tempo de trabalho: 188 horas de trabalho no período de 18.05.-23.06.2017. Método de execução do trabalho: O trabalho foi realizado utilizando a matriz da McKinsey, inquéritos de autodiagnóstico, investigação documental, brainstorming, árvores problemáticas, entrevistas aprofundadas, seminários, etc. No âmbito do trabalho, foram realizadas 3 reuniões na sede da empresa, bem como numerosas teleconferências, chamadas telefónicas e por...

22 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:0022:00, 2 March 2023DG Regio talk contribs 79,245 bytes −1,728 Changed label, description and/or aliases in sk, hr, ga, et, pt, fi, ro, mt, lt, lv, bg, sl, cs, sv, fr, nl, el, de, hu, da, and other parts

21 October 2022

13 August 2022

  • curprev 17:4017:40, 13 August 2022DG Regio talk contribs 80,155 bytes +51,193 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:3921:39, 30 November 2021DG Regio talk contribs 17,620 bytes +2,944 Created claim: summary (P836): Travail NAD MBI Temps de travail: 188 heures-homme dans la période 18.05.-23.06.2017. Méthode d’exécution des travaux: Le travail a été réalisé avec la matrice de McKinsey, des enquêtes d’autodiagnostic, des recherches documentaires, des remue-méninges, un arbre de problèmes, des entrevues approfondies, des travaux d’atelier, etc. Dans le cadre des travaux, il y a eu 3 réunions au siège social de l’entreprise, ainsi que de nombreuses téléconfére...
  • curprev 21:3921:39, 30 November 2021DG Regio talk contribs 14,676 bytes +152 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 17:1817:18, 14 October 2020DG Regio talk contribs 14,964 bytes +148 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:1817:18, 14 October 2020DG Regio talk contribs 14,816 bytes −140 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:1717:17, 14 October 2020DG Regio talk contribs 14,956 bytes +2,511 Created claim: summary (P836): Work NAD MBI Work time: 188 working hours in the period 18.05.-23.06.2017. Method of carrying out work: The work was carried out using McKinsey’s matrix, autodiagnosis surveys, desk research, brainstorming, problem trees, in-depth interviews, workshops, etc. As part of the work, 3 meetings were held at the company headquarters as well as numerous teleconferences, telephone and e-mail calls. Involvement of the advisor: The advisor fully implement...
  • curprev 17:1717:17, 14 October 2020DG Regio talk contribs 12,445 bytes −1,931 Removed claim: summary (P836): The work of the NAD MBI:188 man-hours for the period 18.05-23.06.2017.The work was carried out by means of the McKinsey matrix, self-survey surveys, research papers, brainstorming, problem tree, in-depth interviews, workshop work, etc.In the framework of the work, 3 meetings took place in the premises of the company and a number of teleconferences, telephone and mailing meetings.The involvement of the adviser:The consultant fully implemented t...

16 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:2910:29, 4 March 2020DG Regio talk contribs 12,654 bytes +1,931 Created claim: summary (P836): The work of the NAD MBI:188 man-hours for the period 18.05-23.06.2017.The work was carried out by means of the McKinsey matrix, self-survey surveys, research papers, brainstorming, problem tree, in-depth interviews, workshop work, etc.In the framework of the work, 3 meetings took place in the premises of the company and a number of teleconferences, telephone and mailing meetings.The involvement of the adviser:The consultant fully implemented the...

18 February 2020

8 February 2020

31 January 2020

14 January 2020