Revision history of "Construction of SIMBA system and archiving for PO PC by 2017" (Q87205)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2122:21, 12 October 2024DG Regio talk contribs 45,343 bytes −8 Changed label, description and/or aliases in pt
  • curprev 22:2122:21, 12 October 2024DG Regio talk contribs 45,351 bytes +11 Set a claim value: summary (P836): O objetivo do projeto é gerir e executar eficazmente o programa dos Estados-Membros do PO, financiando os custos associados à criação, ao funcionamento e à eventual alteração do «Sistema de Informação para. Monitorização, investigação e análise" para os Estados-Membros do PO e cobertura dos eventuais custos de arquivo da documentação.

7 March 2024

6 July 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 22:4322:43, 2 March 2023DG Regio talk contribs 43,666 bytes +320 Changed label, description and/or aliases in da, it, sk, et, ga, cs, es, lv, el, fr, de, sv, ro, bg, lt, hu, hr, fi, pt, nl, sl, mt, and other parts

27 October 2022

26 October 2022

24 October 2022

26 July 2022

  • curprev 04:4904:49, 26 July 2022DG Regio talk contribs 41,269 bytes +24,216 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

20 May 2022

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:0121:01, 30 November 2021DG Regio talk contribs 11,967 bytes +1,157 Created claim: summary (P836): L’objectif du projet est de gérer et de mettre en œuvre efficacement le programme OP PC en finançant les coûts liés à la mise en place, au fonctionnement et à la modification éventuelle du «système informatique». Suivi, recherche et analyse" pour le PO PC et couvrant les coûts éventuels d’archivage de la documentation., translated_summary
  • curprev 21:0121:01, 30 November 2021DG Regio talk contribs 10,810 bytes +129 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 15:1115:11, 15 October 2020DG Regio talk contribs 11,121 bytes +119 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1115:11, 15 October 2020DG Regio talk contribs 11,002 bytes −149 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1115:11, 15 October 2020DG Regio talk contribs 11,151 bytes +1,123 Created claim: summary (P836): The aim of the project is to efficiently manage and implement the OP MS programme by financing the costs associated with the creation, operation and possible modification of the "Information System for. Monitoring, Research and Analysis" for OP MS and covering possible costs of archiving documentation., translated_summary
  • curprev 15:1115:11, 15 October 2020DG Regio talk contribs 10,028 bytes −707 Removed claim: summary (P836): The aim of the project is to smooth the management and implementation of the OP for the MS by financing the costs related to the creation, operation and possible modification of the "Information system on theMonitoring, Research and Analysis, for the purposes of the OP for MS and covering the possible cost of archiving documentation., remove_old_english_translation

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1410:14, 4 March 2020DG Regio talk contribs 9,444 bytes +707 Created claim: summary (P836): The aim of the project is to smooth the management and implementation of the OP for the MS by financing the costs related to the creation, operation and possible modification of the "Information system on theMonitoring, Research and Analysis, for the purposes of the OP for MS and covering the possible cost of archiving documentation., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020