Revision history of "Public internet for everyone in the Lomianki Municipality" (Q86826)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0622:06, 12 October 2024DG Regio talk contribs 61,916 bytes +2 Changed label, description and/or aliases in pt
  • curprev 22:0622:06, 12 October 2024DG Regio talk contribs 61,914 bytes +60 Set a claim value: summary (P836): O projecto faz parte da Acção 1.1. É uma POPC. A Internet Pública para Todos consistirá na instalação de uma rede Wi-Fi pública completamente nova. O projeto lançará dois pontos de acesso internos e nove pontos de acesso externos. Localizações previstas:1) pontos internos:a. centro desportivo e cultural – Centro de Integração para a Educação e o Desporto – 22) pontos externos:a. centro desportivo e cultural – Centro de Integração para a Educação e o...

22 March 2024

15 January 2024

11 June 2023

24 May 2023

2 March 2023

23 October 2022

26 July 2022

  • curprev 04:4204:42, 26 July 2022DG Regio talk contribs 58,870 bytes +36,203 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:3921:39, 30 November 2021DG Regio talk contribs 14,903 bytes +1,810 Created claim: summary (P836): Le projet est conforme à l’action 1.1. POPC. Internet public pour tout le monde, s’appuiera sur l’installation d’un tout nouveau réseau Wi-Fi public. Le projet lancera 2 points d’accès internes et 9 points d’accès externes. Lieux prévus:1) points intérieurs:a. centre sportif et culturel — Centre sportif intégratif — 22) points extérieurs:a. centre sportif et culturel — Centre sportif intégratif — 2b. Lieu — Lac Dziekanowskie — 2c. Réserve nature...
  • curprev 21:3921:39, 30 November 2021DG Regio talk contribs 13,093 bytes +112 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5914:59, 14 October 2020DG Regio talk contribs 13,421 bytes +116 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5914:59, 14 October 2020DG Regio talk contribs 13,305 bytes −124 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5914:59, 14 October 2020DG Regio talk contribs 13,429 bytes +1,795 Created claim: summary (P836): The project is part of Action 1.1. IT’S A POPC. Public Internet for Everyone will consist of installing a completely new public Wi-Fi network. The project will launch 2 internal access points and 9 external access points. Planned locations:1) internal points:a. sports and cultural centre – Integration Centre for Educational and Sports – 22) external points:a. sports and cultural centre – Integration Center for Education and Sport – 2b. Place – D...
  • curprev 14:5914:59, 14 October 2020DG Regio talk contribs 11,634 bytes −1,288 Removed claim: summary (P836): The project is in line with action 1.1.POPC.The public internet for everyone will be connected to the installation of a fully new public Wi-Fi network.The project will mobilise 2 internal access points and 9 external access points.Planned locations: 1) Internal Points: a. cultural Sports Centre — Integrative Sports and Sport Centre — 22) External posts: a. cultural Sports Centre — Integrative Centre of didactic facilities (2b).Place — Jezioro...

23 September 2020

15 July 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1110:11, 4 March 2020DG Regio talk contribs 11,211 bytes +1,288 Created claim: summary (P836): The project is in line with action 1.1.POPC.The public internet for everyone will be connected to the installation of a fully new public Wi-Fi network.The project will mobilise 2 internal access points and 9 external access points.Planned locations: 1) Internal Points: a. cultural Sports Centre — Integrative Sports and Sport Centre — 22) External posts: a. cultural Sports Centre — Integrative Centre of didactic facilities (2b).Place — Jezioro Dz...

18 February 2020

8 February 2020

31 January 2020

14 January 2020