Revision history of "Elimination of territorial disparities in high-speed broadband coverage in the Chelm-Zamoan sub-region, part A1, ID: 3.3.06.10a1’" (Q86785)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)

12 October 2024

  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 91,667 bytes −3 Changed label, description and/or aliases in pt
  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 91,670 bytes −26 Set a claim value: summary (P836): O projeto diz respeito à construção na sub-região NUTS-3 – Chełm-Zamojski (parte A1), ID: 3.3.06.10a1 no distrito de Biłgoraj, Zamość (a seguir designada «zona de intervenção») de rede de banda larga por cabo (para agregados familiares e unidades educativas), com uma extensão total de 1937,30 km. Como resultado do projeto, 33.003 famílias e 158 estabelecimentos de ensino terão acesso à Internet. 33 003 explorações agrícolas terão acesso a redes com,...

12 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 22:4222:42, 2 March 2023DG Regio talk contribs 79,555 bytes +7 Changed label, description and/or aliases in da, it, sk, sv, et, lv, bg, hr, ga, ro, fr, cs, el, fi, lt, de, mt, es, hu, pt, nl, sl, and other parts

23 October 2022

26 July 2022

  • curprev 04:4104:41, 26 July 2022DG Regio talk contribs 78,027 bytes +40,594 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 21:2621:26, 30 November 2021DG Regio talk contribs 39,171 bytes +2,075 Created claim: summary (P836): Le projet concerne la construction dans la sous-région NUTS-3 — Chełmsko-Zamojski (partie A1), ID: 3.3.06.10a1 dans le comté de Biłgoraj, Zamość, Zamość (ci-après dénommé «zone d’intervention») en technologie du câble (pour les ménages et les unités éducatives) d’une longueur totale de 1 937,30 km. Grâce à ce projet, 33 003 ménages et 158 établissements d’enseignement auront accès à Internet. 33 003 exploitations auront accès à un réseau d’au mo...
  • curprev 21:2621:26, 30 November 2021DG Regio talk contribs 37,096 bytes +253 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5814:58, 14 October 2020DG Regio talk contribs 37,283 bytes +191 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5814:58, 14 October 2020DG Regio talk contribs 37,092 bytes −197 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5814:58, 14 October 2020DG Regio talk contribs 37,289 bytes +1,935 Created claim: summary (P836): The project concerns construction in the NUTS-3 – Chełm-Zamojski subregion (part A1), ID: 3.3.06.10a1 in the Biłgoraj district, Zamość (hereinafter referred to as the Intervention Area) of cable broadband network (for households and educational units) with a total length of 1937,30 km. As a result of the project, 33,003 households and 158 educational establishments will have access to the Internet. 33 003 farms will have access to networks with...
  • curprev 14:5814:58, 14 October 2020DG Regio talk contribs 35,354 bytes −1,538 Removed claim: summary (P836): The project concerns the construction within NUTS-3 of the Chełmsko-zamojski subregion (A1 part), ID:3.3.06.10A1, in the county of bielrazavan, Zamora, m. Zamość (‘the Intervention Area’) of a broadband network in cable technology (for households and educational establishments) of a total length of 1 937.30 km.As a result of the project, 33 003 households and 158 educational establishments will have access to the internet.33 003 farms will hav...

23 September 2020

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)