Revision history of "Elimination of territorial differences in high-capacity broadband connectivity in the Hrubieszów district" (Q86782)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)

12 October 2024

  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 85,640 bytes −4 Changed label, description and/or aliases in pt
  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 85,644 bytes −98 Set a claim value: summary (P836): A empresa Hrubieszowska TV Kablowa sp. z o.o. tenciona realizar um investimento no distrito de Hrubieszów relacionado com a medida 1.1. Eliminar as diferenças territoriais no acesso à banda larga de alta capacidade do POPC. O projeto envolve a construção de uma rede de fibra ótica, um nó central (PWR), nós de rede de acesso e a configuração de postes de rádio com equipamento. As escolas do distrito referido nos requisitos serão ligadas por uma ligaç...

12 March 2024

15 January 2024

11 June 2023

24 May 2023

2 March 2023

  • curprev 22:4222:42, 2 March 2023DG Regio talk contribs 80,461 bytes +1,545 Changed label, description and/or aliases in it, lv, da, bg, sk, hu, fr, pt, cs, fi, ro, el, ga, mt, es, et, de, lt, hr, sv, sl, nl, and other parts

23 October 2022

13 August 2022

  • curprev 17:3217:32, 13 August 2022DG Regio talk contribs 78,101 bytes +47,028 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 21:2621:26, 30 November 2021DG Regio talk contribs 23,400 bytes +2,566 Created claim: summary (P836): Hrubieszowska Telewizja Kablowa sp. z o.o. a l’intention de réaliser un investissement dans le district de Hrubieszowski relatif à l’action 1.1. Éliminer les différences territoriales dans les possibilités d’accès à large bande à haute vitesse de POPC. Le projet comprend la construction d’un réseau à fibre optique, d’un nœud dorsal (PWR), de nœuds de réseau d’accès et de mise en place de mâts radio avec équipement. Les écoles du district susment...
  • curprev 21:2621:26, 30 November 2021DG Regio talk contribs 20,834 bytes +194 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5814:58, 14 October 2020DG Regio talk contribs 21,080 bytes +166 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5814:58, 14 October 2020DG Regio talk contribs 20,914 bytes −176 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5814:58, 14 October 2020DG Regio talk contribs 21,090 bytes +2,319 Created claim: summary (P836): The company Hrubieszowska TV Kablowa sp. z o.o. intends to carry out an investment in the Hrubieszów district related to Measure 1.1. Eliminate territorial differences in access to high-capacity broadband of POPC. The project involves the construction of a fibre optic network, a backbone node (PWR), access network nodes and the setting of radio masts with equipment. Schools in the district referred to in the requirements will be connected with a...
  • curprev 14:5814:58, 14 October 2020DG Regio talk contribs 18,771 bytes −1,895 Removed claim: summary (P836): Hrubieszowska Telewizja Kablowa sp. z o.o. intends to carry out an investment in the area of Hrubieszowski, associated with Measure 1.1.Eliminate territorial disparities in broadband internet access opportunities.The project involves the construction of a fibre optic network, backbone node (PWR), access nodes of access networks and positioning of radio masts and equipment.The schools in the above District are defined in the requirements set ou...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0010:00, 4 March 2020DG Regio talk contribs 16,062 bytes +1,895 Created claim: summary (P836): Hrubieszowska Telewizja Kablowa sp. z o.o. intends to carry out an investment in the area of Hrubieszowski, associated with Measure 1.1.Eliminate territorial disparities in broadband internet access opportunities.The project involves the construction of a fibre optic network, backbone node (PWR), access nodes of access networks and positioning of radio masts and equipment.The schools in the above District are defined in the requirements set out...

18 February 2020

8 February 2020

31 January 2020

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)