Revision history of "NGA network for the Inowrocław area 3.6.04.67" (Q86780)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4615:46, 13 October 2024DG Regio talk contribs 51,531 bytes −3 Changed label, description and/or aliases in pt
  • curprev 15:4615:46, 13 October 2024DG Regio talk contribs 51,534 bytes −1 Set a claim value: summary (P836): O projeto inclui a construção de 49 subáreas independentes na arquitetura FTTH para 13 116 agregados familiares e o fornecimento de acesso à Internet a 197 estabelecimentos de ensino da área de Inowrocław. A essência do projeto consiste em eliminar as diferenças territoriais no acesso à Internet de banda larga de elevada capacidade, oferecendo serviços grossistas prestados através de infraestruturas de acesso integradas.

23 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 19:4519:45, 2 March 2023DG Regio talk contribs 47,697 bytes +290 Changed label, description and/or aliases in lv, sk, it, da, ro, ga, fi, pt, et, sv, es, lt, hr, el, nl, hu, sl, bg, de, mt, cs, and other parts

23 October 2022

26 July 2022

  • curprev 04:4104:41, 26 July 2022DG Regio talk contribs 45,489 bytes +25,347 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 21:2521:25, 30 November 2021DG Regio talk contribs 15,934 bytes +1,276 Created claim: summary (P836): Le projet comprend la construction de 49 sous-zones indépendantes dans l’architecture FTTH pour 13 116 ménages et la fourniture d’un accès Internet à 197 établissements d’enseignement de la région d’Inowrocław. Le projet vise essentiellement à éliminer les différences territoriales dans les possibilités d’accès Internet à haut débit en offrant des services de gros fournis à l’aide d’une infrastructure d’accès intégré., translated_summary
  • curprev 21:2521:25, 30 November 2021DG Regio talk contribs 14,658 bytes +112 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5814:58, 14 October 2020DG Regio talk contribs 14,986 bytes +105 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5814:58, 14 October 2020DG Regio talk contribs 14,881 bytes −108 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5814:58, 14 October 2020DG Regio talk contribs 14,989 bytes +1,219 Created claim: summary (P836): The project includes the construction of 49 independent sub-areas in the FTTH architecture for 13,116 households and the provision of Internet access for 197 educational establishments from the Inowrocław area. The essence of the project is to eliminate territorial differences in high-capacity broadband internet access by offering wholesale services provided using built-in access infrastructure., translated_summary
  • curprev 14:5814:58, 14 October 2020DG Regio talk contribs 13,770 bytes −763 Removed claim: summary (P836): The project involves the construction of 49 independent sub-areas in FTTH architecture for 13 116 households and the provision of internet access for 197 educational establishments from the area of Inowrocław.The purpose of the project is to eliminate territorial disparities in broadband internet access by offering wholesale services through the use of constructed access infrastructure., remove_old_english_translation

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0010:00, 4 March 2020DG Regio talk contribs 11,583 bytes +763 Created claim: summary (P836): The project involves the construction of 49 independent sub-areas in FTTH architecture for 13 116 households and the provision of internet access for 197 educational establishments from the area of Inowrocław.The purpose of the project is to eliminate territorial disparities in broadband internet access by offering wholesale services through the use of constructed access infrastructure., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020