Revision history of "Construction of school access networks of the National Educational Network under priority axis I “Universal access to high-speed Internet” of the Operational Programme Digital Poland for the years 2014-2020" (Q86754)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 75,605 bytes +12 Changed label, description and/or aliases in pt
  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 75,593 bytes +17 Set a claim value: summary (P836): Será desenvolvida no âmbito do projecto uma configuração normalizada da rede de acesso; para cada escola, serão recolhidas as informações necessárias para a construção e modernização da rede de acesso de acordo com uma norma específica e, em seguida, nessas escolas: Instalação de equipamento adequado; a necessária infraestrutura da rede de acesso e, sempre que tecnicamente viável, a reconfiguração de outros dispositivos que trabalham na escola (adap...

7 March 2024

13 December 2023

6 July 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 22:4222:42, 2 March 2023DG Regio talk contribs 75,405 bytes −288 Changed label, description and/or aliases in it, fr, lv, da, ro, es, el, sk, fi, sv, et, cs, hu, sl, pt, ga, lt, hr, mt, de, bg, nl, and other parts

27 October 2022

26 October 2022

24 October 2022

26 July 2022

  • curprev 04:4004:40, 26 July 2022DG Regio talk contribs 73,617 bytes +47,678 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:2221:22, 30 November 2021DG Regio talk contribs 15,889 bytes +2,358 Created claim: summary (P836): Le projet développera une configuration standard du réseau d’accès; pour chaque école, les informations nécessaires à la construction et à la mise à niveau du réseau d’accès selon une certaine norme seront collectées, suivies par: l’équipement approprié installé; L’infrastructure nécessaire du réseau d’accès et, si techniquement possible, la reconfiguration d’autres dispositifs travaillant dans l’école (adaptation au nouveau réseau d’accès) sero...
  • curprev 21:2221:22, 30 November 2021DG Regio talk contribs 13,531 bytes +296 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 17:0717:07, 14 October 2020DG Regio talk contribs 13,675 bytes +270 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:0617:06, 14 October 2020DG Regio talk contribs 13,405 bytes −256 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:0617:06, 14 October 2020DG Regio talk contribs 13,661 bytes +2,199 Created claim: summary (P836): A standard access network configuration will be developed within the project; for each school, the information needed for the construction and modernisation of the access network according to a specific standard will be collected and then in these schools: appropriate equipment installed; the necessary access network infrastructure and, where technically feasible, reconfiguration of other devices working at school (adapting to the new access net...
  • curprev 17:0617:06, 14 October 2020DG Regio talk contribs 11,462 bytes −1,764 Removed claim: summary (P836): The project will develop the standard configuration of the access network;the information needed for the construction and upgrading of access networks according to a specific standard will be collected for each school and will then be collected in these schools:the appropriate equipment installed;the necessary infrastructure of access network infrastructure and, if technically feasible, other devices working at the school will be reconfigured...

25 September 2020

23 September 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0010:00, 4 March 2020DG Regio talk contribs 11,939 bytes +1,764 Created claim: summary (P836): The project will develop the standard configuration of the access network;the information needed for the construction and upgrading of access networks according to a specific standard will be collected for each school and will then be collected in these schools:the appropriate equipment installed;the necessary infrastructure of access network infrastructure and, if technically feasible, other devices working at the school will be reconfigured (a...

18 February 2020

8 February 2020

31 January 2020

14 January 2020