Revision history of "Health Sector Action Plan 2014-2016" (Q86747)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4515:45, 13 October 2024DG Regio talk contribs 63,512 bytes +9 Changed label, description and/or aliases in pt
  • curprev 15:4515:45, 13 October 2024DG Regio talk contribs 63,503 bytes −11 Set a claim value: summary (P836): Assegurar um apoio eficaz à execução do PO IIA 2014-2020 pelo Ministério da Saúde enquanto intermediário para o eixo prioritário IX: — assegurar uma capacidade institucional adequada (por exemplo, equipamento dos postos de trabalho, formação), — assegurar o processo adequado de seleção, controlo, acompanhamento, informação e promoção dos projetos, — execução de estudos de avaliação, a fim de reforçar a eficiência do sistema de execução do PO IIA 201...

12 March 2024

6 July 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4222:42, 2 March 2023DG Regio talk contribs 61,840 bytes −161 Changed label, description and/or aliases in da, sk, sv, ga, cs, sl, lv, hu, el, ro, fr, hr, pt, nl, de, lt, es, et, bg, mt, and other parts

27 October 2022

26 October 2022

24 October 2022

13 August 2022

  • curprev 17:3217:32, 13 August 2022DG Regio talk contribs 59,922 bytes +37,601 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:2221:22, 30 November 2021DG Regio talk contribs 14,208 bytes +2,031 Created claim: summary (P836): Assurer un soutien efficace à la mise en œuvre du PO I & E 2014-2020 par le ministère de la santé en tant qu’organisme intermédiaire pour l’axe prioritaire IX: — assurer une capacité institutionnelle adéquate (par exemple, équipement des lieux de travail, formation), — assurer le bon processus de sélection, de contrôle, de suivi, d’information et de publicité des projets, — mettre en œuvre des études d’évaluation afin de renforcer l’efficacité d...
  • curprev 21:2221:22, 30 November 2021DG Regio talk contribs 12,177 bytes +99 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 17:0617:06, 14 October 2020DG Regio talk contribs 12,518 bytes +94 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:0617:06, 14 October 2020DG Regio talk contribs 12,424 bytes −80 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:0617:06, 14 October 2020DG Regio talk contribs 12,504 bytes +1,850 Created claim: summary (P836): Ensuring effective support for the implementation of OP IIA 2014-2020 by the Ministry of Health as an intermediary for Priority Axis IX by: — ensuring adequate institutional capacity (e.g. equipping workstations, training), – ensuring the proper process of project selection, control, monitoring, information and promotion, – implementation of evaluation studies in order to strengthen the efficiency of the implementation system of OP IIA 2014-2020...
  • curprev 17:0617:06, 14 October 2020DG Regio talk contribs 10,654 bytes −1,381 Removed claim: summary (P836): Ensuring effective support for the implementation of OP I & E 2014-2020 by the Ministry of Health as the intermediate body for priority axis IX by:— ensuring an adequate institutional capacity (including job creation, training), ensuring an appropriate selection process for projects, controls, monitoring, information and publicity, carrying out evaluation studies to reinforce the efficiency of the implementation of OP I & E OP 2014-2020.The pr...

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0010:00, 4 March 2020DG Regio talk contribs 10,746 bytes +1,381 Created claim: summary (P836): Ensuring effective support for the implementation of OP I & E 2014-2020 by the Ministry of Health as the intermediate body for priority axis IX by:— ensuring an adequate institutional capacity (including job creation, training), ensuring an appropriate selection process for projects, controls, monitoring, information and publicity, carrying out evaluation studies to reinforce the efficiency of the implementation of OP I & E OP 2014-2020.The proj...

18 February 2020

8 February 2020

31 January 2020

14 January 2020