Revision history of "Reconstruction of SOR Specialist Hospital in Piła with ramp for ambulances and retrofitting with medical equipment including pre-intensive care stations" (Q86423)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4615:46, 13 October 2024DG Regio talk contribs 69,848 bytes −19 Changed label, description and/or aliases in pt
  • curprev 15:4615:46, 13 October 2024DG Regio talk contribs 69,867 bytes +68 Set a claim value: summary (P836): A fim de corrigir as deficiências identificadas, estão previstas no âmbito do projeto as seguintes ações: 1. Desenvolvimento da documentação do projecto. 2. Desenvolvimento de um estudo de viabilidade. 3. Obras de construção, que consistem na reconstrução e reparação do SOR, a fim de adaptar as instalações existentes para fins funcionais e de utilização aos regulamentos aplicáveis [Regulamento do Ministro da Saúde, de 3 de novembro de 2011, relativo...

22 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4122:41, 2 March 2023DG Regio talk contribs 67,044 bytes −1,013 Changed label, description and/or aliases in sk, it, lv, da, bg, ga, es, et, fi, ro, nl, sv, lt, sl, pt, hu, fr, hr, de, el, cs, mt, and other parts

24 October 2022

13 August 2022

  • curprev 17:2917:29, 13 August 2022DG Regio talk contribs 67,246 bytes +42,322 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1221:12, 30 November 2021DG Regio talk contribs 15,988 bytes +2,101 Created claim: summary (P836): Dans le cadre du projet, les actions suivantes sont prévues pour remédier aux lacunes constatées: 1. Élaboration de la documentation du projet. 2. Élaboration d’une étude de faisabilité. 3. Travaux de construction consistant en la reconstruction et la rénovation du SOR afin d’adapter les locaux existants aux règlements applicables (Règlement du ministre de la Santé du 3 novembre 2011 sur le service des urgences hospitalières (Journal des lois 20...
  • curprev 21:1221:12, 30 November 2021DG Regio talk contribs 13,887 bytes +227 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 16:4316:43, 14 October 2020DG Regio talk contribs 14,100 bytes +213 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4316:43, 14 October 2020DG Regio talk contribs 13,887 bytes −207 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4316:43, 14 October 2020DG Regio talk contribs 14,094 bytes +2,043 Created claim: summary (P836): In order to address identified deficiencies, the following actions are planned under the project: 1. Development of project documentation. 2. Development of a feasibility study. 3. Construction works, consisting of the reconstruction and repair of the SOR in order to adapt the existing premises for functional and use purposes to the applicable regulations (Regulation of the Minister of Health of 3 November 2011 on the Hospital Emergency Departme...
  • curprev 16:4316:43, 14 October 2020DG Regio talk contribs 12,051 bytes −1,440 Removed claim: summary (P836): The following actions are planned to address the identified gaps:1.Development of project documentation.2.Development of a feasibility study.3.Construction works, consisting of the reconstruction and renovation of the SAC in order to adapt the existing provisions (Ordinance of the Minister of Health of 3 November 2011 on the hospital rescue unit (Journal of Laws 2015.178)), to replace technical installations constituting media equipment for ne...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:2410:24, 4 March 2020DG Regio talk contribs 11,772 bytes +1,440 Created claim: summary (P836): The following actions are planned to address the identified gaps:1.Development of project documentation.2.Development of a feasibility study.3.Construction works, consisting of the reconstruction and renovation of the SAC in order to adapt the existing provisions (Ordinance of the Minister of Health of 3 November 2011 on the hospital rescue unit (Journal of Laws 2015.178)), to replace technical installations constituting media equipment for new...

18 February 2020

8 February 2020

31 January 2020

14 January 2020