Revision history of "Expansion and reconstruction with retrofitting of the H. Klimontowicz Specialist Hospital in Gorlice with the use of energy-efficient technological solutions" (Q86340)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2522:25, 12 October 2024DG Regio talk contribs 53,030 bytes −22 Changed label, description and/or aliases in pt
  • curprev 22:2522:25, 12 October 2024DG Regio talk contribs 53,052 bytes −27 Set a claim value: summary (P836): Âmbito do projeto: 1) Reconstrução do SOR existente, 2) adição de um conector entre a zona pública do SOR e a rede de comunicações da secção geral B do hospital, 3) adição de uma ponte de entrada externa à sala de descontaminação, 4) Substituição das unidades de ventilação, 5) Utilização de lâmpadas de poupança de energia, 6) Instalação de dois centros de ar condicionado, 7) Instalação da unidade de água gelada, 8) Aquisição e instalação de monitori...

22 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4122:41, 2 March 2023DG Regio talk contribs 50,319 bytes +740 Changed label, description and/or aliases in lv, sk, it, da, sv, pt, et, fr, de, cs, ga, fi, mt, hu, ro, lt, el, es, hr, bg, nl, sl, and other parts

24 October 2022

26 July 2022

  • curprev 04:3204:32, 26 July 2022DG Regio talk contribs 48,767 bytes +28,586 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:0221:02, 30 November 2021DG Regio talk contribs 13,884 bytes +1,410 Created claim: summary (P836): Portée matérielle du projet: 1) la reconstruction d’un SOR existant, 2) l’ajout d’un connecteur entre la zone publique SOR et la séquence générale de communication du segment B de l’hôpital, 3) la construction d’une plate-forme d’entrée extérieure à la salle de décontamination, 4) le remplacement des unités de ventilation, 5) l’utilisation de lampes d’éclairage à économie d’énergie, 6) la mise en place de deux unités de climatisation, 7) la mise...
  • curprev 21:0221:02, 30 November 2021DG Regio talk contribs 12,474 bytes +234 Changed label, description and/or aliases in fr: translated_label

29 October 2020

15 October 2020

  • curprev 15:4115:41, 15 October 2020DG Regio talk contribs 12,680 bytes +217 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:4115:41, 15 October 2020DG Regio talk contribs 12,463 bytes −267 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:4115:41, 15 October 2020DG Regio talk contribs 12,730 bytes +1,303 Created claim: summary (P836): The scope of the project: 1) Reconstruction of the existing SOR, 2) addition of a connector between the public SOR zone and the communication network of the general section B of the hospital, 3) the addition of an external entrance bridge to the decontamination room, 4) Replacement of ventilation units, 5) Use of energy-saving lighting lamps, 6) Setting two air-conditioning centers, 7) Setting the ice water unit, 8) Purchase and monitoring insta...
  • curprev 15:4115:41, 15 October 2020DG Regio talk contribs 11,427 bytes −892 Removed claim: summary (P836): Project scope:(1) Reconstruction of the existing SOR, 2) completion of the link between the public access zone for the SOR and the general segment B of the hospital’s segment B communication), (3) the daily external bridge entrance to the decontamination room, (4) the replacement of the ventilation units, (5) the use of energy-saving lighting lamps, (6) the setting up of two air conditioning units, (7) the Act of ice water assembly, (8) Purcha...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1710:17, 4 March 2020DG Regio talk contribs 10,607 bytes +892 Created claim: summary (P836): Project scope:(1) Reconstruction of the existing SOR, 2) completion of the link between the public access zone for the SOR and the general segment B of the hospital’s segment B communication), (3) the daily external bridge entrance to the decontamination room, (4) the replacement of the ventilation units, (5) the use of energy-saving lighting lamps, (6) the setting up of two air conditioning units, (7) the Act of ice water assembly, (8) Purchase...

18 February 2020

8 February 2020

31 January 2020

14 January 2020