Revision history of "New quality of the theatre – reconstruction and modernisation of the Jan Kochanowski Theatre in Opole for cultural and educational purposes." (Q86186)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 68,584 bytes −2 Changed label, description and/or aliases in pt
  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 68,586 bytes −6 Set a claim value: summary (P836): Âmbito do projeto: Reconstrução da fachada principal do teatro com envolvente contígua e reconstrução da sala do Centro de Educação Cultural do Teatro; etapa 1: Reconstrução da fachada com a envolvente adjacente fase 2: Reconstrução do CEK Tarefa 3 Reconstrução do sistema de ventilação e ar condicionado no edifício do Teatro; etapa 1: Trabalho necessário para executar independentemente da execução de qualquer fase (canal de pulverização, ventilação...

7 March 2024

15 January 2024

10 June 2023

24 May 2023

2 March 2023

24 October 2022

26 July 2022

  • curprev 04:2804:28, 26 July 2022DG Regio talk contribs 64,742 bytes +40,292 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 20:5420:54, 30 November 2021DG Regio talk contribs 15,728 bytes +2,131 Created claim: summary (P836): Portée matérielle du projet: Reconstruction de la façade principale du Théâtre avec ses environs adjacents et reconstruction de la salle dans le Centre d’éducation culturelle du Théâtre; étape 1: Reconstruction de la façade avec entourage adjacent étape 2: Reconstruction de la tâche 3 du CEK Reconstruction du système de ventilation et de climatisation dans le bâtiment du théâtre; étape 1: Travaux nécessaires pour effectuer indépendamment de l’ex...
  • curprev 20:5420:54, 30 November 2021DG Regio talk contribs 13,597 bytes +204 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 16:0016:00, 14 October 2020DG Regio talk contribs 13,833 bytes +202 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:0016:00, 14 October 2020DG Regio talk contribs 13,631 bytes −206 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:0016:00, 14 October 2020DG Regio talk contribs 13,837 bytes +1,925 Created claim: summary (P836): The scope of the project: Reconstruction of the main façade of the theatre with adjoining surroundings and reconstruction of the room at the Cultural Education Centre in the Theatre; step 1: Reconstruction of the façade with adjacent surroundings stage 2: Reconstruction of CEK Task 3 Reconstruction of the ventilation and air conditioning system in the Theatre building; step 1: Work necessary to perform independently of the execution of any stage...
  • curprev 16:0016:00, 14 October 2020DG Regio talk contribs 11,912 bytes −1,427 Removed claim: summary (P836): Project scope:Reconstruction of the main façade of the Teatru façade with the surrounding surroundings and the reconstruction of the premises at the Centre for Cultural Education at Teatra;stage 1:Conversion of the façade from the surroundings of phase 2:Reconstruction of CEK Task 3 Conversion of ventilation and air conditioning system in the Theatre building;stage 1:Work required for performance independent of the execution of any step (chann...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1310:13, 4 March 2020DG Regio talk contribs 11,620 bytes +1,427 Created claim: summary (P836): Project scope:Reconstruction of the main façade of the Teatru façade with the surrounding surroundings and the reconstruction of the premises at the Centre for Cultural Education at Teatra;stage 1:Conversion of the façade from the surroundings of phase 2:Reconstruction of CEK Task 3 Conversion of ventilation and air conditioning system in the Theatre building;stage 1:Work required for performance independent of the execution of any step (channel...

18 February 2020

8 February 2020

31 January 2020

14 January 2020