Revision history of "Conversion of station 110/15 kV Oborniki" (Q86146)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4615:46, 13 October 2024DG Regio talk contribs 75,483 bytes −7 Changed label, description and/or aliases in pt
  • curprev 15:4615:46, 13 October 2024DG Regio talk contribs 75,490 bytes −816 Set a claim value: summary (P836): O objeto do projeto é a modernização global do principal ponto de alimentação 110/15 kV GPZ Oborniki (divisão 110 kV, sala de comutação SN, necessidades próprias, infraestruturas de segurança, infraestruturas de comunicação e compensação de potência passiva). O âmbito do projeto abrangerá os seguintes elementos: — em substituição do atual sistema de ar condicionado, sala de comutação de sistema único de duas secções do sistema H5, — num novo edifíci...

22 March 2024

15 January 2024

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4122:41, 2 March 2023DG Regio talk contribs 73,551 bytes +14,146 Changed label, description and/or aliases in it, da, bg, lv, sk, ro, ga, pt, et, fr, hr, cs, el, lt, hu, de, sv, sl, fi, mt, and other parts

24 October 2022

26 July 2022

  • curprev 04:2704:27, 26 July 2022DG Regio talk contribs 58,591 bytes +32,237 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:2221:22, 30 November 2021DG Regio talk contribs 16,020 bytes +2,608 Created claim: summary (P836): L’objet du projet est la modernisation complète du point d’alimentation principal 110/15 kV GPZ Oborniki (sous-division 110 kV, appareillage SN, besoins propres, infrastructure de sécurité, infrastructure de communication et puissance réactive compensatoire). Le champ d’application du projet couvrira les éléments suivants: — sur le site de l’appareil de commutation monosystème à deux sections existant dans le système H5, — dans le nouveau bâtime...
  • curprev 21:2221:22, 30 November 2021DG Regio talk contribs 13,412 bytes +110 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 13,742 bytes +99 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 13,643 bytes −97 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 13,740 bytes +1,643 Created claim: summary (P836): The subject of the project is comprehensive modernisation of the main power point 110/15 kV GPZ Oborniki (Division 110 kV, SN switching room, own needs, security infrastructure, communication infrastructure and passive power compensation). The scope of the project will cover the following elements: — in the place of the existing system of the air-conditioning, two-section, single-system switching room in the system H5, – in a new building the bu...
  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 12,097 bytes −1,572 Removed claim: summary (P836): The project consists of a comprehensive modernisation of the main operating point 110/15 kV GPZ Oborniki (Division 110 kV, SN, own needs, security infrastructure, communication infrastructure and reactive power compensation).The scope of the project will include the following elements:— In a new building construction 34 MVA 5 kV switchgear (2 sections 15 lines, 10 linear fields, 24 function fields), the construction of two seats for transforme...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1910:19, 4 March 2020DG Regio talk contribs 11,957 bytes +1,572 Created claim: summary (P836): The project consists of a comprehensive modernisation of the main operating point 110/15 kV GPZ Oborniki (Division 110 kV, SN, own needs, security infrastructure, communication infrastructure and reactive power compensation).The scope of the project will include the following elements:— In a new building construction 34 MVA 5 kV switchgear (2 sections 15 lines, 10 linear fields, 24 function fields), the construction of two seats for transformers...

18 February 2020

8 February 2020

31 January 2020

14 January 2020