Revision history of "Construction of the medium pressure gas network Kutno-Krośniewice with gas station" (Q86145)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4615:46, 13 October 2024DG Regio talk contribs 52,920 bytes −1 Changed label, description and/or aliases in pt
  • curprev 15:4615:46, 13 October 2024DG Regio talk contribs 52,921 bytes +12 Set a claim value: summary (P836): O projecto consiste na construção do gasoduto de média pressão I° e do posto de gasolina, juntamente com a instalação ACP e de telemetria, e na ligação das instalações ao sistema de distribuição de gás. Parâmetros fundamentais previstos para a construção do gasoduto: Gasoduto Dz225 PE L= 14320 m e gasoduto Dz180 PE L= 10940 m. Parâmetros fundamentais da estação de redução prevista: — Caudal de aprovação Q = 2000 Nm3/h – pressão máxima de entrada da...

23 March 2024

15 January 2024

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4122:41, 2 March 2023DG Regio talk contribs 49,432 bytes −120 Changed label, description and/or aliases in it, da, ro, lv, fr, sk, cs, fi, hr, es, hu, bg, et, ga, pt, de, el, sv, sl, nl, lt, mt, and other parts

24 October 2022

26 July 2022

  • curprev 04:2704:27, 26 July 2022DG Regio talk contribs 48,740 bytes +28,080 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 21:2221:22, 30 November 2021DG Regio talk contribs 15,479 bytes +1,426 Created claim: summary (P836): Le projet consiste en la construction d’un gazoduc et d’une station gazière de réduction de pression I°, ainsi que de l’installation ACPiA et de l’installation de télémétrie, et de la connexion des installations au système d’élimination des gaz. Paramètres de base du pipeline à construire: Pipeline Dz225 PE L= 14 320 m et pipeline Dz180 PE L=10940 m. Paramètres de base de la station de réduction prévue: — Débit Q = 2000 Nm3/h — Pression d’entrée...
  • curprev 21:2221:22, 30 November 2021DG Regio talk contribs 14,053 bytes +153 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 14,340 bytes +142 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 14,198 bytes −142 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 14,340 bytes +1,359 Created claim: summary (P836): The project consists of the construction of the I° medium pressure pipeline and gas station, together with the ACP and telemetry installation, and the connection of the facilities to the gas dispensing system. Basic parameters planned for the construction of the pipeline: Gas pipeline Dz225 PE L= 14320 m and gas pipeline Dz180 PE L= 10940 m. Basic parameters of the planned reduction station: — Pass rate Q = 2000 Nm3/h – ILO max. inlet pressure =...
  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 12,981 bytes −868 Removed claim: summary (P836): The project consists of the construction of a medium-pressure medium and a reductive gas station, together with the installation of AKPiA and a telemetric system, and the connection of facilities to the gas supply system.Basic parameters planned for the construction of the gas pipeline:225 PE L = 14 320 m and the PE 180 L = 10 940 m pipeline.Basic parameters of the intended reducing station:— The skills of Q = 2000 Nm3/h — With an MOPSC of 5,5...

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1910:19, 4 March 2020DG Regio talk contribs 11,310 bytes +868 Created claim: summary (P836): The project consists of the construction of a medium-pressure medium and a reductive gas station, together with the installation of AKPiA and a telemetric system, and the connection of facilities to the gas supply system.Basic parameters planned for the construction of the gas pipeline:225 PE L = 14 320 m and the PE 180 L = 10 940 m pipeline.Basic parameters of the intended reducing station:— The skills of Q = 2000 Nm3/h — With an MOPSC of 5,5 M...

18 February 2020

8 February 2020

31 January 2020

14 January 2020