Revision history of "The Two-Creature Gas pipeline" (Q86134)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)

13 October 2024

  • curprev 15:4515:45, 13 October 2024DG Regio talk contribs 57,068 bytes +3 Changed label, description and/or aliases in pt
  • curprev 15:4515:45, 13 October 2024DG Regio talk contribs 57,065 bytes −31 Set a claim value: summary (P836): O projeto tem por objeto a construção do gasoduto DN1000 ILO 8.4MPa, com um comprimento de 55 km a partir do nó Tworóg (executado no âmbito do projeto Kędzierzyn – Tworóg: voivodato de śląskie, distrito de Tarnogórski) à equipa de remoção de barragens de Tworzeń (voivodato da Silésia, cidade de Dąbrowa Górnicza), juntamente com as infraestruturas: 5 sistemas de firewall ao longo do percurso da conduta, dispositivos de proteção catódica, sistema de c...

23 March 2024

15 January 2024

28 June 2023

10 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

26 January 2023

25 January 2023

24 October 2022

26 July 2022

  • curprev 04:2704:27, 26 July 2022DG Regio talk contribs 46,676 bytes +26,164 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 21:2721:27, 30 November 2021DG Regio talk contribs 16,840 bytes +1,396 Created claim: summary (P836): Le projet concerne la construction du gazoduc DN1000 MOP 8,4MPa d’une longueur de 55 km de la jonction Tworóg prévue (mise en œuvre dans le cadre du projet Kędzierzyn — Tworóg: Voïvodie de Silésie, district de Tarno Góra) jusqu’à l’équipe du barrage et de l’évent de Tworzeń (Voïvodie de Silésie, ville de Dąbrowa Górnicza), y compris les infrastructures: 5 unités d’arrêt le long de la route du pipeline, dispositifs de protection contre la cathode...
  • curprev 21:2721:27, 30 November 2021DG Regio talk contribs 15,444 bytes +83 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 15,801 bytes +88 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 15,713 bytes −84 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 15,797 bytes +1,326 Created claim: summary (P836): The subject of the project is the construction of the DN1000 ILO 8.4MPa gas pipeline with a length of 55 km from the Tworóg node (implemented within the framework of the Kędzierzyn – Tworóg project: śląskie voivodship, Tarnogórski county) to the dam-off team of Tworzeń (Silesian Voivodeship, City of Dąbrowa Górnicza) together with infrastructure: 5 firewall systems along the pipeline route, cathode protection devices, communication and control s...
  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 14,471 bytes −847 Removed claim: summary (P836): The project consists of the construction of an ILO 8,4MPa DN1000 pipeline on the section from the designed hub of Tworóg (implemented as part of the Kędzierzyn project):Voivodship śląskie, Polnocnoski District) attached to a containment team — Twordfish (Silesian Region, city of Dąbrowa Górnicza) and infrastructure:5 Systems for the pipeline route, the cathode-ray protection equipment, the communication and control equipment, the optical line,...

15 July 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1810:18, 4 March 2020DG Regio talk contribs 11,118 bytes +847 Created claim: summary (P836): The project consists of the construction of an ILO 8,4MPa DN1000 pipeline on the section from the designed hub of Tworóg (implemented as part of the Kędzierzyn project):Voivodship śląskie, Polnocnoski District) attached to a containment team — Twordfish (Silesian Region, city of Dąbrowa Górnicza) and infrastructure:5 Systems for the pipeline route, the cathode-ray protection equipment, the communication and control equipment, the optical line, e...

18 February 2020

8 February 2020

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)