Revision history of "Construction of the two-track Krajnik-Baczyna-Plewiska line with construction/expansion/modernisation of the station in this line" (Q86122)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4515:45, 13 October 2024DG Regio talk contribs 71,662 bytes 0 Changed label, description and/or aliases in pt
  • curprev 15:4515:45, 13 October 2024DG Regio talk contribs 71,662 bytes 0 Set a claim value: summary (P836): O projeto abrangerá quatro tarefas de investimento distintas, designadas por: Construção da linha 400 kV Krajnik-Baczyna, Construção da linha 400 kV Baczyna-Plewiska, Construção da estação 400/110 kV Baczyna com a introdução da linha 400 kV Krajnik-Plewiska, Expansão da estação 400/110 kV Baczyna devido à introdução da linha 400 kV Baczyna-Plewiska e instalação de equipamentos para compensação de potência passiva. Além disso, a aquisição e a entrega...

22 March 2024

15 January 2024

13 December 2023

6 July 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4122:41, 2 March 2023DG Regio talk contribs 67,882 bytes +157 Changed label, description and/or aliases in da, it, sk, et, bg, hr, ga, cs, fr, sv, lv, ro, lt, el, es, fi, de, hu, mt, pt, sl, nl, and other parts

24 October 2022

26 July 2022

  • curprev 04:2704:27, 26 July 2022DG Regio talk contribs 65,465 bytes +38,213 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 21:2621:26, 30 November 2021DG Regio talk contribs 19,168 bytes +2,041 Created claim: summary (P836): Le projet couvrira quatre tâches d’investissement distinctes appelées: Construction d’une ligne de 400 kV Krajnik-Baczyna, construction d’une ligne de 400 kV Baczyna-Plewiska, construction de la station 400/110 kV Baczyna avec introduction de la ligne de 400 kV Krajnik-Plewiska, extension de la station 400/110 kV Baczyna en raison de l’introduction de la ligne de 400 kV Baczyna-Plewiska et installation de dispositifs de compensation de puissance...
  • curprev 21:2621:26, 30 November 2021DG Regio talk contribs 17,127 bytes +209 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 17,358 bytes +189 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 17,169 bytes −194 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 17,363 bytes +1,905 Created claim: summary (P836): The project will cover 4 separate investment tasks called: Construction of the line 400 kV Krajnik-Baczyna, Construction of line 400 kV Baczyna-Plewiska, Construction of station 400/110 kV Baczyna with the introduction of line 400 kV Krajnik-Plewiska, Expansion of station 400/110 kV Baczyna due to the introduction of line 400 kV Baczyna-Plewiska and installation of equipment for passive power compensation. In addition, the purchase and delivery...
  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 15,458 bytes −1,421 Removed claim: summary (P836): The project will cover 4 separate investment tasks, called:Construction of the 400 kV Basica-Babczyn line, Construction of 400 kV Basczyn-Plewiska line, Construction of 400/110 kV Basczyn line with the introduction of the 400 kV Krajnik Plewiska line, Construction of 400/110 kV Basczyn station, and the installation of 400 kV Bavia-Plewiska line and the installation of reactive power compensation equipment.In addition, the purchase and supply o...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1810:18, 4 March 2020DG Regio talk contribs 13,514 bytes +1,421 Created claim: summary (P836): The project will cover 4 separate investment tasks, called:Construction of the 400 kV Basica-Babczyn line, Construction of 400 kV Basczyn-Plewiska line, Construction of 400/110 kV Basczyn line with the introduction of the 400 kV Krajnik Plewiska line, Construction of 400/110 kV Basczyn station, and the installation of 400 kV Bavia-Plewiska line and the installation of reactive power compensation equipment.In addition, the purchase and supply of...

18 February 2020

8 February 2020

31 January 2020

14 January 2020