Revision history of "Construction of the pipeline between Lewin Brzeski and Paczków on the Hanuszów – Otmuchów section" (Q86119)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4515:45, 13 October 2024DG Regio talk contribs 58,509 bytes +6 Changed label, description and/or aliases in pt
  • curprev 15:4515:45, 13 October 2024DG Regio talk contribs 58,503 bytes −16 Set a claim value: summary (P836): Âmbito em espécie do projeto: Reconstrução das relações DN 150 CN 6.3 MPa entre Lewin Brzeski e Paczków, troço de Hanuszów – Otmuchów. Tarefas – gasoduto c/C Hanuszów – Goświnowice, – gasoduto c/c Goświnowice – Otmuchów. O gasoduto previsto será construído em campos aráveis, longe de edifícios residenciais. O percurso será paralelo ao antigo gasoduto a uma distância de 0,5 a 1,5 m, exceto em troços curtos, em que o gasoduto previsto é paralelo aos l...

20 March 2024

15 January 2024

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4122:41, 2 March 2023DG Regio talk contribs 55,403 bytes −560 Changed label, description and/or aliases in da, sk, cs, fi, de, lv, el, sv, et, pt, bg, ro, nl, ga, hr, fr, hu, sl, lt, mt, and other parts

24 October 2022

26 July 2022

  • curprev 04:2704:27, 26 July 2022DG Regio talk contribs 55,158 bytes +33,154 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 21:2621:26, 30 November 2021DG Regio talk contribs 15,386 bytes +1,632 Created claim: summary (P836): Portée matérielle du projet: Reconstruction du gazoduc DN 150 CN 6.3 MPa entre Lewin Brzeski et Paczków, section Hanuszów — Otmuchów. Tâches — Hanuszów — gazoduc Goświnowice, — gazoduc à Goświnowice — Otmuchów. Le gazoduc prévu sera construit sur des terres agricoles, loin du développement résidentiel. L’itinéraire se déroulera parallèlement à l’ancien gazoduc à une distance de 0,5 à 1,5 m, à l’exception des tronçons courts, où le gazoduc prévu...
  • curprev 21:2621:26, 30 November 2021DG Regio talk contribs 13,754 bytes +145 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 14,049 bytes +162 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 13,887 bytes −169 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 14,056 bytes +1,608 Created claim: summary (P836): In-kind scope of the project: Reconstruction of the DN 150 CN 6.3 MPa relations between Lewin Brzeski and Paczków, section of Hanuszów – Otmuchów. Tasks – gas pipeline w/C Hanuszów – Goświnowice, – gas pipeline w/c Goświnowice – Otmuchów. The planned gas pipeline will be built in arable fields, away from residential buildings. The route will run parallel to the old pipeline at a distance of 0.5 to 1.5 m, except for short sections, where the plan...
  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 12,448 bytes −1,216 Removed claim: summary (P836): Material scope of the project:Reconstruction of the DN 150 CN line 6,3 MPa section of Lewin Brzeski — Paczków, section of Hanuszów — Otmuchów.Tasks — gas pipeline in/c Hanuszów — Goświnowice, — gas pipeline in/c Goświnowice — Otmuchów.The planned gas pipeline will be built on arable land areas away from residential construction.The route will run in parallel to the old gas pipeline at a distance of 0,5 to 1.5 m except for short sections where...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1810:18, 4 March 2020DG Regio talk contribs 11,539 bytes +1,216 Created claim: summary (P836): Material scope of the project:Reconstruction of the DN 150 CN line 6,3 MPa section of Lewin Brzeski — Paczków, section of Hanuszów — Otmuchów.Tasks — gas pipeline in/c Hanuszów — Goświnowice, — gas pipeline in/c Goświnowice — Otmuchów.The planned gas pipeline will be built on arable land areas away from residential construction.The route will run in parallel to the old gas pipeline at a distance of 0,5 to 1.5 m except for short sections where a...

18 February 2020

8 February 2020

31 January 2020

14 January 2020