Revision history of "Czeszów-Kiełczów gas pipeline" (Q86116)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 54,094 bytes +19 Set a claim value: summary (P836): O projeto tem por objeto a construção do gasoduto Czeszów-Kiełczów. O projeto situa-se inteiramente na voivodia de Dolnośląskie (fracamente desenvolvida). O projeto prevê a execução dos seguintes projetos: construção do novo gasoduto Czeszów-Kiełczów (no troço de junção Czeszów-Kiełczów), juntamente com a infraestrutura (2 barreiras de proteção, unidade de ligação, equipamento de proteção e comunicação e controlo do cátodo), com os seguintes parâmet...

7 March 2024

15 January 2024

10 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

26 January 2023

25 January 2023

24 October 2022

13 August 2022

  • curprev 17:2717:27, 13 August 2022DG Regio talk contribs 48,314 bytes +28,032 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 21:2621:26, 30 November 2021DG Regio talk contribs 14,660 bytes +1,463 Created claim: summary (P836): Le projet concerne la construction du gazoduc Czeszów-Kiełczów. Le projet est entièrement situé dans la voïvodie de Basse Silésie (moins développée). Le projet prévoit la mise en œuvre des projets suivants: construction du nouveau gazoduc Czeszów-Kiełczów (sur le tronçon ZZU Czeszów — Kiełczów) ainsi que de l’infrastructure (2 unités d’arrêt, unité de raccordement, équipement de protection contre les cathodes et de communication et de contrôle)...
  • curprev 21:2621:26, 30 November 2021DG Regio talk contribs 13,197 bytes +89 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 13,548 bytes +91 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 13,457 bytes −87 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 13,544 bytes +1,436 Created claim: summary (P836): The subject of the project is the construction of the Czeszów-Kiełczów gas pipeline. The project is located entirely in the Dolnośląskie Voivodeship (weakly developed). The project envisages the implementation of the following projects: construction of the new Czeszów-Kiełczów gas pipeline (on the section of Czeszów – Kiełczów junction) together with the infrastructure (2 firewalls, connection unit, cathode protection and communication and contr...
  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 12,108 bytes −927 Removed claim: summary (P836): The project involves the construction of the Czeszów- Kiełczów pipeline.The project is entirely located in the region of Dolnoslaskie (less developed).The project envisages the following projects:construction of the new Czeszów- Kiełczów pipeline (section ZZU Czeszów — Kiełczów section) and infrastructure (2 block and bleed units, connection assembly, cathode-ray protection and communication and control units) with the following parameters:Nom...

15 September 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1810:18, 4 March 2020DG Regio talk contribs 10,904 bytes +927 Created claim: summary (P836): The project involves the construction of the Czeszów- Kiełczów pipeline.The project is entirely located in the region of Dolnoslaskie (less developed).The project envisages the following projects:construction of the new Czeszów- Kiełczów pipeline (section ZZU Czeszów — Kiełczów section) and infrastructure (2 block and bleed units, connection assembly, cathode-ray protection and communication and control units) with the following parameters:Nomin...

18 February 2020

8 February 2020

31 January 2020

14 January 2020