Revision history of "Sustainable urban transport system in Gorzów Wlkp." (Q86093)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2522:25, 12 October 2024DG Regio talk contribs 51,064 bytes −29 Set a claim value: summary (P836): O projeto implementará a construção e modernização de vias de elétrico, bem como a aquisição e implementação de um sistema de informação e monitorização dos passageiros, incluindo informações dinâmicas sobre paragens, na Internet e em dispositivos móveis. 1. A construção de um novo eléctrico juntamente com a infra-estrutura, juntamente com a infra-estrutura de longa distância. 3,32 km; 2. Modernização das rotas de elétrico existentes com infraestrut...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

24 October 2022

26 July 2022

  • curprev 04:2404:24, 26 July 2022DG Regio talk contribs 48,310 bytes +28,570 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:2521:25, 30 November 2021DG Regio talk contribs 13,689 bytes +1,443 Created claim: summary (P836): Dans le cadre du projet, la construction et la modernisation des lignes de tramway seront réalisées, ainsi que l’achat et la mise en œuvre d’un système d’information et de surveillance des passagers, y compris des informations dynamiques aux arrêts, sur Internet et sur les appareils mobiles. 1. Construction d’un nouveau tramway avec infrastructure d’accompagnement. 3,32 km; 2. Modernisation des lignes de tramway existantes avec les infrastructur...
  • curprev 21:2521:25, 30 November 2021DG Regio talk contribs 12,246 bytes +112 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3215:32, 14 October 2020DG Regio talk contribs 12,574 bytes +110 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3215:32, 14 October 2020DG Regio talk contribs 12,464 bytes −110 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3215:32, 14 October 2020DG Regio talk contribs 12,574 bytes +1,382 Created claim: summary (P836): The project will implement the construction and modernisation of tram routes, as well as the purchase and implementation of a passenger information and monitoring system, including dynamic information on stops, on the Internet and on mobile devices. 1. The construction of a new tramway along with the infrastructure along with the long-distance infrastructure. 3,32 km; 2. Modernisation of existing tram routes with accompanying infrastructure long...
  • curprev 15:3215:32, 14 October 2020DG Regio talk contribs 11,192 bytes −836 Removed claim: summary (P836): The project will build and modernise tram routes and will acquire and operate a passenger information and monitoring system, including dynamic information at stop, on the Internet and in mobile devices.1.Construction of a new tram line with associated infrastructure3.32 km;2.Modernisation of existing tram routes with associated infrastructure6.55 km:3.The purchase and implementation of the passenger information and monitoring system at bus and...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1810:18, 4 March 2020DG Regio talk contribs 10,310 bytes +836 Created claim: summary (P836): The project will build and modernise tram routes and will acquire and operate a passenger information and monitoring system, including dynamic information at stop, on the Internet and in mobile devices.1.Construction of a new tram line with associated infrastructure3.32 km;2.Modernisation of existing tram routes with associated infrastructure6.55 km:3.The purchase and implementation of the passenger information and monitoring system at bus and t...

18 February 2020

8 February 2020

31 January 2020

14 January 2020