Revision history of "Construction of a tram on Gocław in Warsaw with the purchase of rolling stock" (Q86091)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 March 2023

9 March 2023

18 October 2022

26 July 2022

  • curprev 04:2404:24, 26 July 2022DG Regio talk contribs 44,748 bytes +25,379 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

8 February 2022

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:2421:24, 30 November 2021DG Regio talk contribs 13,992 bytes +1,240 Created claim: summary (P836): Le projet couvre les tâches suivantes: — Construction d’une ligne de tramway sur Gocław, — reconstruction de la ligne de tramway en al. Washington sur la section Washington — Rondo Wiatraczna, — Achat de 18 tramways à un seul étage surbaissé, — Livraison de cartes du système d’information sur les passagers en temps réel ainsi que de l’infrastructure de télécommunication et du service continu., translated_summary
  • curprev 21:2421:24, 30 November 2021DG Regio talk contribs 12,752 bytes +146 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3215:32, 14 October 2020DG Regio talk contribs 13,046 bytes +137 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3215:32, 14 October 2020DG Regio talk contribs 12,909 bytes −132 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3215:32, 14 October 2020DG Regio talk contribs 13,041 bytes +1,187 Created claim: summary (P836): The project’s scope covers the following tasks: — Construction of the tram route to Gocław, – Reconstruction of the tram route in al. Washington, D.C. at the Washington – Wind Rondo section, – Purchase of 18 single-way low-floor trams, – Delivery of real-time Passenger Information System boards with telecommunication infrastructure and running service., translated_summary
  • curprev 15:3215:32, 14 October 2020DG Regio talk contribs 11,854 bytes −751 Removed claim: summary (P836): The scope of the project includes the following tasks:— Construction of a tram line on Goklawa — Construction of a tram line in al.By Washington on the Rondo Washington section, — The purchase of 18 unidirectional low-floor trams, — Supply of tables from the Passenger Information System to real time with the maintenance of telecommunications infrastructure and running., remove_old_english_translation

15 July 2020

22 June 2020

16 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1810:18, 4 March 2020DG Regio talk contribs 10,085 bytes +751 Created claim: summary (P836): The scope of the project includes the following tasks:— Construction of a tram line on Goklawa — Construction of a tram line in al.By Washington on the Rondo Washington section, — The purchase of 18 unidirectional low-floor trams, — Supply of tables from the Passenger Information System to real time with the maintenance of telecommunications infrastructure and running., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020