Revision history of "Reconstruction of tracks in the streets: Wierzbięcice and 28 June 1956" (Q86083)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4515:45, 13 October 2024DG Regio talk contribs 48,613 bytes −3 Changed label, description and/or aliases in pt
  • curprev 15:4515:45, 13 October 2024DG Regio talk contribs 48,616 bytes +14 Set a claim value: summary (P836): Conceção e execução de obras de construção para a reconstrução da rota do elétrico de duas vias nas ruas Wierzbięcice e 28 de junho de 1956 em Poznań. O projecto envolve a reconstrução de: infraestruturas de vias, infraestruturas de rede, infraestruturas de paragens de autocarro, instalações subterrâneas (na medida prevista pelas condições técnicas dos Gestadents da rede), bem como pavimentos rodoviários e percursos pedonais que façam parte integran...

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 47,348 bytes −290 Changed label, description and/or aliases in lv, da, it, bg, sk, et, hr, lt, es, pt, ro, ga, hu, fr, sv, de, mt, cs, sl, el, fi, and other parts

24 October 2022

26 July 2022

  • curprev 04:2304:23, 26 July 2022DG Regio talk contribs 46,826 bytes +27,546 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:2421:24, 30 November 2021DG Regio talk contribs 13,510 bytes +1,364 Created claim: summary (P836): Conception et exécution de travaux de construction pour la reconstruction d’un tramway à deux voies le long de Wierzbięcice et le 28 juin 1956 à Poznań. Le projet consiste à reconstruire: les infrastructures de voies, les infrastructures de réseau, les infrastructures d’arrêt, les installations souterraines (dans la mesure prévue par les conditions techniques des gesteurs de réseau) ainsi que les surfaces routières et les routes piétonnes faisan...
  • curprev 21:2421:24, 30 November 2021DG Regio talk contribs 12,146 bytes +129 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3215:32, 14 October 2020DG Regio talk contribs 12,457 bytes +130 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3215:32, 14 October 2020DG Regio talk contribs 12,327 bytes −134 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3215:32, 14 October 2020DG Regio talk contribs 12,461 bytes +1,334 Created claim: summary (P836): Design and execution of construction works for the reconstruction of the two-track tram route within Wierzbięcice Streets and 28 June 1956 in Poznań. The project involves the reconstruction of: track infrastructure, network infrastructure, bus stop infrastructure, underground installations (to the extent provided for by the technical conditions of the Gestadents of the network) as well as road pavements and pedestrian routes forming an integral...
  • curprev 15:3215:32, 14 October 2020DG Regio talk contribs 11,127 bytes −860 Removed claim: summary (P836): The project and the execution of the demolition works for the reconstruction of the double-track tram line in the streets of Wierzbęcice and on 28 June 1956 in Poznań.The project involves the reconstruction of:track infrastructure, network infrastructure, stop infrastructure, underground installations (as far as the technical conditions of networks are laid down) and those of pedestrians that are an integral part of the urban area of the stree...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0910:09, 4 March 2020DG Regio talk contribs 10,271 bytes +860 Created claim: summary (P836): The project and the execution of the demolition works for the reconstruction of the double-track tram line in the streets of Wierzbęcice and on 28 June 1956 in Poznań.The project involves the reconstruction of:track infrastructure, network infrastructure, stop infrastructure, underground installations (as far as the technical conditions of networks are laid down) and those of pedestrians that are an integral part of the urban area of the streets...

18 February 2020

8 February 2020

31 January 2020

14 January 2020