Revision history of "Sustainable urban transport system in Gorzów Wlkp. — tramway rolling stock and technical infrastructure" (Q86075)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 15:4515:45, 13 October 2024DG Regio talk contribs 65,605 bytes +6 Changed label, description and/or aliases in pt
  • curprev 15:4515:45, 13 October 2024DG Regio talk contribs 65,599 bytes −122 Set a claim value: summary (P836): O projeto inclui, entre outros: 1. Aquisição de 14 novos vagões eléctricos, A tarefa inclui a compra de 14 novos vagões eléctricos bidireccionais com um comprimento de 23 a 26 m. Vagões serão de três peças, piso baixo accionado por motores AC com controlo electrónico. 2. Modernização da sala de eléctricos e estações de serviço, o sistema de monitorização de escadas? O âmbito material da tarefa consiste em: Lavagem de peças sob pressão e componentes...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

24 October 2022

26 July 2022

  • curprev 04:2304:23, 26 July 2022DG Regio talk contribs 63,342 bytes +39,026 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:2421:24, 30 November 2021DG Regio talk contribs 15,586 bytes +2,121 Created claim: summary (P836): Le projet comprend, entre autres: 1. Achat de 14 wagons de tramway neufs, La tâche comprend l’achat de 14 wagons de tramway bidirectionnels neufs d’une longueur de 23 à 26 m. Les wagons seront des voitures à plancher surbaissé à trois membres alimentées par des moteurs à courant alternatif avec commande électronique. 2. Modernisation de la salle de tramway et de la station-service, système de surveillance des voies de départ? Le champ d’applicat...
  • curprev 21:2421:24, 30 November 2021DG Regio talk contribs 13,465 bytes +174 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3115:31, 14 October 2020DG Regio talk contribs 13,731 bytes +166 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3115:31, 14 October 2020DG Regio talk contribs 13,565 bytes −166 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3115:31, 14 October 2020DG Regio talk contribs 13,731 bytes +1,830 Created claim: summary (P836): The project includes, among others: 1. Purchase of 14 new tram wagons, The task includes the purchase of 14 brand-new two-way tram wagons with a length of 23 to 26 m. Wagons will be three-piece, low floor driven by AC motors with electronic control. 2. Modernisation of the tram hall and service stations, the system of monitoring of stairways? The material scope of the task is to: Washing of pressure parts and tram components, washing of large tr...
  • curprev 15:3115:31, 14 October 2020DG Regio talk contribs 11,901 bytes −1,510 Removed claim: summary (P836): The project includes, but is not limited to:1.The purchase of 14 new tram wagons, Zadanie Activity consists of the purchase of 14 factory new, two-way tram wagons of between 23 and 26 m in length. the wagons will be triarticulated, low floor AC powered by electronic control.2.Modernisation of the tram hall and service station, system for the monitoring of the public tracks?The scope of the mission is to:Washing machines for the pressure washin...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0910:09, 4 March 2020DG Regio talk contribs 11,698 bytes +1,510 Created claim: summary (P836): The project includes, but is not limited to:1.The purchase of 14 new tram wagons, Zadanie Activity consists of the purchase of 14 factory new, two-way tram wagons of between 23 and 26 m in length. the wagons will be triarticulated, low floor AC powered by electronic control.2.Modernisation of the tram hall and service station, system for the monitoring of the public tracks?The scope of the mission is to:Washing machines for the pressure washing...

18 February 2020

8 February 2020

31 January 2020

14 January 2020