Revision history of "Integrated Rail Transport System in Agglomeration and Wroclaw – Stage III A" (Q86073)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 43,030 bytes −1 Changed label, description and/or aliases in pt
  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 43,031 bytes +30 Set a claim value: summary (P836): A construção da pista de bonde, juntamente com a reconstrução necessária do armamento de colisão. Reconstrução do viaduto ferroviário para efeitos do itinerário em ul. Uma comprida. Conceção multidisciplinar (estrada, via, teletécnica, elétrica, canal de água, ponte, etc.)

12 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 41,749 bytes −79 Changed label, description and/or aliases in sk, da, it, el, sv, bg, lv, fr, hu, fi, ro, de, ga, cs, es, et, pt, lt, nl, sl, mt, hr, and other parts

24 October 2022

26 July 2022

  • curprev 04:2304:23, 26 July 2022DG Regio talk contribs 41,009 bytes +23,256 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:2421:24, 30 November 2021DG Regio talk contribs 12,832 bytes +1,101 Created claim: summary (P836): Construction d’une voie de tramway avec la reconstruction nécessaire des armements de collision. Reconstruction du viaduc ferroviaire aux fins de l’itinéraire en ul. Une longue. Projet multidisciplinaire (route, piste, télétechnique, électrique, canal d’eau, pont, etc.), translated_summary
  • curprev 21:2421:24, 30 November 2021DG Regio talk contribs 11,731 bytes +157 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3115:31, 14 October 2020DG Regio talk contribs 12,014 bytes +136 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3115:31, 14 October 2020DG Regio talk contribs 11,878 bytes −139 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3115:31, 14 October 2020DG Regio talk contribs 12,017 bytes +1,104 Created claim: summary (P836): The construction of the tramway track along with the necessary reconstruction of the collision weaponry. Reconstruction of the railway viaduct for the purpose of the route in ul. A long one. Multi-discipline design (road, track, teletechnical, electrical, water-channel, bridge, etc.), translated_summary
  • curprev 15:3115:31, 14 October 2020DG Regio talk contribs 10,913 bytes −610 Removed claim: summary (P836): Construction of a tramway track with the necessary collision construction.Reconstruction of the railway viaduct for the purpose of the route in ul.Long.Multi-screen design (road, track, telecommunications, electrical, water, bridge, etc.), remove_old_english_translation

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0910:09, 4 March 2020DG Regio talk contribs 9,810 bytes +610 Created claim: summary (P836): Construction of a tramway track with the necessary collision construction.Reconstruction of the railway viaduct for the purpose of the route in ul.Long.Multi-screen design (road, track, telecommunications, electrical, water, bridge, etc.), Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020