Revision history of "Reconstruction of tram tracks in Szczecin – stage II" (Q86064)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

13 October 2024

  • curprev 06:2406:24, 13 October 2024DG Regio talk contribs 85,607 bytes −2 Changed label, description and/or aliases in pt
  • curprev 06:2306:23, 13 October 2024DG Regio talk contribs 85,609 bytes +33 Set a claim value: summary (P836): O projeto consiste na reconstrução das vias de elétrico em Szczecin, na reconstrução de duas subestações retificadoras, na construção de uma nova estação retificadora e na reconstrução do depósito de Golęcin. O projecto consistirá nas seguintes tarefas: Tarefa 1. Reconstrução da via com catenária: (a) no decorrer de al. Independência – pl. Soldado polaco – al. Libertação – pl. Rodła (com a praça de Rodła) a Ronda Giedroyć. b) dentro de ul. Kołłątaja...

23 March 2024

15 January 2024

13 December 2023

28 June 2023

10 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 83,542 bytes −1,209 Changed label, description and/or aliases in da, sk, lv, it, cs, ga, fi, ro, hu, et, lt, sv, hr, nl, pt, bg, mt, de, el, sl, and other parts

24 October 2022

26 July 2022

  • curprev 04:2204:22, 26 July 2022DG Regio talk contribs 83,930 bytes +53,654 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

8 February 2022

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:2321:23, 30 November 2021DG Regio talk contribs 17,840 bytes +2,901 Created claim: summary (P836): Le projet comprend la reconstruction des voies de tramway à Szczecin, la reconstruction de deux sous-stations de redressement, la construction d’une nouvelle station de redressement et la reconstruction du dépôt de Golęcin. Le projet comprend les tâches suivantes: Activité 1. Reconstruction des voies avec ligne aérienne de contact: a) à l’intérieur d’al. Indépendance — pl. Soldat polonais — al. Libération — pl. Rodła (avec la place Rodła) jusqu’...
  • curprev 21:2321:23, 30 November 2021DG Regio talk contribs 14,939 bytes +120 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1515:15, 14 October 2020DG Regio talk contribs 15,259 bytes +113 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1515:15, 14 October 2020DG Regio talk contribs 15,146 bytes −116 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1515:15, 14 October 2020DG Regio talk contribs 15,262 bytes +2,812 Created claim: summary (P836): The project consists of reconstruction of tram tracks in Szczecin, reconstruction of two rectifier substations, construction of a new rectifier station and reconstruction of the Golęcin depot. The project shall consist of the following tasks: Task 1. Reconstruction of the track with overhead contact line: (a) in the course of al. Independence – pl. Polish soldier – al. Liberation – pl. Rodła (with the square of Rodła) to Ronda Giedroyć. b) withi...
  • curprev 15:1515:15, 14 October 2020DG Regio talk contribs 12,450 bytes −2,290 Removed claim: summary (P836): The project consists of the reconstruction of tramway tracks in Szczecin, the redevelopment of two auxiliary substations, the construction of a new rectifying station and the redevelopment of the ‘Golęcin’ depot.The project consists of the following tasks:Target 1.Design of the track, together with the overhead contact line:(a) within al.IndependencePolish soldier — al.For the Liberation of the People’s Liberation Army.Rodin (including the bea...

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0910:09, 4 March 2020DG Regio talk contribs 13,022 bytes +2,290 Created claim: summary (P836): The project consists of the reconstruction of tramway tracks in Szczecin, the redevelopment of two auxiliary substations, the construction of a new rectifying station and the redevelopment of the ‘Golęcin’ depot.The project consists of the following tasks:Target 1.Design of the track, together with the overhead contact line:(a) within al.IndependencePolish soldier — al.For the Liberation of the People’s Liberation Army.Rodin (including the beach...

18 February 2020

8 February 2020

31 January 2020

14 January 2020