Revision history of "Pure public transport – increasing mobility of residents of the Opole Agglomeration and modernisation of infrastructure accompanying public transport – stage I" (Q86051)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 89,446 bytes −1 Changed label, description and/or aliases in pt
  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 89,447 bytes −24 Set a claim value: summary (P836): O âmbito material do projeto inclui: 1. Preparação do projeto – documentação técnica e estudo de viabilidade 2. Investimento da Tabor – aquisição de 61 novos autocarros urbanos hipocarbónicos com a norma EURO 6, incluindo: • 43 veículos maxi, diesel (l. aprox. 12 m; • 15 megaveículos, a gasóleo (l. aprox. 18 m; • 3 veículos midi, a gasóleo (l. aprox. 10 m). 3. Aquisição de veículo de manutenção (torre) 4. Modernização global do terminal de autocarro...

20 March 2024

15 January 2024

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 86,716 bytes +343 Changed label, description and/or aliases in lv, it, da, bg, sk, et, pt, hr, lt, ga, ro, hu, de, sv, fr, es, sl, cs, mt, nl, el, fi, and other parts

24 October 2022

13 August 2022

  • curprev 17:2717:27, 13 August 2022DG Regio talk contribs 85,566 bytes +55,502 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:2221:22, 30 November 2021DG Regio talk contribs 18,031 bytes +2,899 Created claim: summary (P836): La portée matérielle du projet comprend: 1. Préparation du projet — documentation technique et étude de faisabilité 2. Investissement dans le matériel roulant — achat de 61 nouveaux autobus urbains à faible émission de carbone de la norme EURO 6, y compris: • 43 véhicules maxi, diesel (env. 12 m); • 15 méga-véhicules diesel (env. 18 m); • 3 véhicules midi, diesel (env. 10 m). 3. Achat d’un véhicule d’entretien (camion de remorquage) 4. Modernisa...
  • curprev 21:2221:22, 30 November 2021DG Regio talk contribs 15,132 bytes +243 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1415:14, 14 October 2020DG Regio talk contribs 15,329 bytes +223 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1415:14, 14 October 2020DG Regio talk contribs 15,106 bytes −231 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1415:14, 14 October 2020DG Regio talk contribs 15,337 bytes +2,617 Created claim: summary (P836): The Project’s material scope includes: 1. Project preparation – technical documentation and feasibility study 2. Tabor’s investment – purchase of 61 new low-carbon urban buses with EURO 6 standard, including: • 43 vehicles maxi, diesel (l. approx. 12 m; • 15 mega vehicles, diesel (l. approx. 18 m; • 3 midi vehicles, diesel (l. approx. 10 m). 3. Purchase of maintenance vehicle (tower) 4. Comprehensive modernisation of the bus depot MZK Sp. z o.o....
  • curprev 15:1415:14, 14 October 2020DG Regio talk contribs 12,720 bytes −2,067 Removed claim: summary (P836): The material scope of the Project includes:1.Preparation of the project — technical documentation and feasibility study 2.Rolling stock investment — purchase of 61 new low-emission urban buses with EURO 6 standard, including:• 43 max vehicles, diesel vehicles12 m);• 15 mega vehicles, diesel vehicles18 m);• 3 mitdi and diesel vehicles (length approx.10 m).3.Purchase of the maintenance vehicle (tug) 4.Comprehensive modernisation of the bus lane...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0810:08, 4 March 2020DG Regio talk contribs 13,076 bytes +2,067 Created claim: summary (P836): The material scope of the Project includes:1.Preparation of the project — technical documentation and feasibility study 2.Rolling stock investment — purchase of 61 new low-emission urban buses with EURO 6 standard, including:• 43 max vehicles, diesel vehicles12 m);• 15 mega vehicles, diesel vehicles18 m);• 3 mitdi and diesel vehicles (length approx.10 m).3.Purchase of the maintenance vehicle (tug) 4.Comprehensive modernisation of the bus lane MZ...

18 February 2020

8 February 2020

31 January 2020

14 January 2020