Revision history of "Works on railway lines no. 153,199, 681, 682, and 872 on the section Toszek Północ – Rudziniec Gliwicki – Stare Koźle" (Q86018)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 18:4918:49, 2 March 2023DG Regio talk contribs 82,637 bytes +575 Changed label, description and/or aliases in sl, lv, hr, fi, pt, nl, de, fr, hu, es, it, el, sv, et, mt, ro, ga, cs, sk, da, bg, lt, and other parts

24 October 2022

27 September 2022

26 July 2022

  • curprev 04:2004:20, 26 July 2022DG Regio talk contribs 80,528 bytes +50,801 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 21:2121:21, 30 November 2021DG Regio talk contribs 19,200 bytes +2,637 Created claim: summary (P836): Le projet porte sur les travaux de remise en état des tronçons suivants des lignes de chemin de fer: • Ligne de chemin de fer 153, section: Toszek Północ — Rudziniec Gliwicki du km 0,300 au km 19 318, soit 19,018 km de long; section d’intérêt de l’État, double voie, électrifiée, couverte par les accords internationaux AGC et AGTC. Dans l’option choisie, la réhabilitation de la ligne 153 comprend la voie 1 (actuellement infranchissable), tandis q...
  • curprev 21:2121:21, 30 November 2021DG Regio talk contribs 16,563 bytes +196 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 16,807 bytes +184 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 16,623 bytes −168 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 16,791 bytes +2,507 Created claim: summary (P836): The project includes rehabilitation work on the following sections of railway lines: • Railway Line No 153, in the section: Toszek Północ – Rudziniec Gliwicki from km 0.300 to km 19.318, that is 19.018 km long; a state-of-the-art section, two-track, electrified, covered by international agreements AGC and AGTC. In the selected option, the rehabilitation of Line 153 includes track 1 (currently impassable), while track 2 will be subject to point r...
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 14,284 bytes −2,000 Removed claim: summary (P836): The project involves work of a rehabilitation nature on the following sections of the railway line:• Railway line No 153, on the section:Tocia Północ, Gliwice, from km 0,300 to km 19,318, is 19.018 km long;a section with national relevance, double track, electrified, covered by the international agreements of the AGC and AGTC.In the selected variant, the rehabilitation of line 153 includes track 1 (currently impactors), while track 2 will be s...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0810:08, 4 March 2020DG Regio talk contribs 13,741 bytes +2,000 Created claim: summary (P836): The project involves work of a rehabilitation nature on the following sections of the railway line:• Railway line No 153, on the section:Tocia Północ, Gliwice, from km 0,300 to km 19,318, is 19.018 km long;a section with national relevance, double track, electrified, covered by the international agreements of the AGC and AGTC.In the selected variant, the rehabilitation of line 153 includes track 1 (currently impactors), while track 2 will be sub...

18 February 2020

8 February 2020

31 January 2020

14 January 2020