Revision history of "Works on railway lines no. 140, 148, 157, 159, 173, 689, 691 on the section Chybie – Żory – Rybnik – Nędza/Tur" (Q86014)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)

12 October 2024

  • curprev 22:0422:04, 12 October 2024DG Regio talk contribs 94,928 bytes −4 Changed label, description and/or aliases in pt
  • curprev 22:0422:04, 12 October 2024DG Regio talk contribs 94,932 bytes +103 Set a claim value: summary (P836): O projeto envolve a reabilitação de troços ferroviários que ligam diretamente duas linhas RTE-T, ou seja, E65/C-E65 e E59/C-E59. Situa-se na parte sudoeste da voivodia da Silésia, na área do distrito de Rybnik Węglowa, e é um elemento importante da infraestrutura ferroviária local e europeia na Polónia. O projeto inclui a reabilitação (restauração dos parâmetros técnicos originais) dos novos troços das linhas ferroviárias (todos os troços são linhas...

7 March 2024

15 January 2024

28 June 2023

10 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 87,684 bytes −3,356 Changed label, description and/or aliases in da, it, sk, et, bg, es, ga, cs, hu, hr, fi, sv, de, fr, lv, pt, el, ro, lt, nl, mt, sl, and other parts

24 October 2022

27 September 2022

26 July 2022

  • curprev 04:2004:20, 26 July 2022DG Regio talk contribs 88,458 bytes +53,452 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

8 February 2022

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 21:2121:21, 30 November 2021DG Regio talk contribs 25,092 bytes +2,757 Created claim: summary (P836): Le projet prévoit la remise en état de tronçons de lignes ferroviaires reliant directement les deux lignes RTE-T, à savoir les lignes E65/C-E65 et E59/C-E59. Il est situé dans la partie sud-ouest de la voïvodie de Silésie, dans la zone du district du charbon de Rybnicki, et est un élément important de l’infrastructure ferroviaire locale et européenne en Pologne. Le projet comprend la remise en état (restauration des paramètres techniques d’origi...
  • curprev 21:2121:21, 30 November 2021DG Regio talk contribs 22,335 bytes +195 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 22,580 bytes +178 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 22,402 bytes −165 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 22,567 bytes +2,728 Created claim: summary (P836): The project involves rehabilitation of railway sections directly connecting two TEN-T lines, i.e. E65/C-E65 and E59/C-E59. It is located in the south-western part of the Silesian Voivodeship, in the area of Rybnik Węglowa District, and is an important element of both local and European railway infrastructure in Poland. The project includes rehabilitation (restoration of the original technical parameters) on the new sections of railway lines (all...
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 19,839 bytes −2,211 Removed claim: summary (P836): The project involves the rehabilitation of railway lines connecting directly two TEN-T lines, namely E65/C-E65 and E59/C-E59.It is located in the south-west part of the Silesian region, in the area of Rybnicki of the Coal Circle, and is an important element of both the local and European rail infrastructure in Poland.The project includes rehabilitation (reinstating the original technical parameters) on the following rail lines (all sections ar...

23 September 2020

15 July 2020

22 June 2020

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)