Revision history of "Improvement of the technical condition of engineering facilities, stage I – Modernisation of the railway overpass in Gorzów Wielkopolski" (Q86013)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:0422:04, 12 October 2024DG Regio talk contribs 86,980 bytes +16 Changed label, description and/or aliases in pt
  • curprev 22:0422:04, 12 October 2024DG Regio talk contribs 86,964 bytes −47 Set a claim value: summary (P836): O projeto inclui a modernização do viaduto ferroviário em Gorzów Wielkopolski (voivodato de Lubuskie) no troço da linha n.o 203 – do km 295,591 ao km 297,707 (comprimento de 2,116 km). Presume-se que saia de uma via sem restaurar o tráfego de duas vias no viaduto, ao mesmo tempo que adapta a geometria de projeto da via e a estrutura dos objetos de tal forma que a segunda via possa ser reconstruída no futuro. Inclui a modernização da parede de resist...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

5 November 2022

24 October 2022

27 September 2022

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1621:16, 30 November 2021DG Regio talk contribs 17,947 bytes +2,913 Created claim: summary (P836): Le projet comprend la modernisation de l’estuaire ferroviaire de Gorzów Wielkopolski (Voïvodie de Luuskie) sur le tronçon de la ligne no 203 — du km 295,591 au km 297,707 (longueur de 2,116 km). Il est supposé laisser 1 voie, sans rétablir le mouvement à double voie sur l’estuaire, tout en adaptant la géométrie conçue de la voie et la structure des objets de manière à reconstruire la deuxième piste à l’avenir. Il est envisagé, entre autres, la m...
  • curprev 21:1621:16, 30 November 2021DG Regio talk contribs 15,034 bytes +199 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 15,275 bytes +199 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 15,076 bytes −184 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 15,260 bytes +2,676 Created claim: summary (P836): The project includes modernisation of the railway overpass in Gorzów Wielkopolski (Lubuskie voivodeship) on the section of line No. 203 – from km 295.591 to km 297.707 (length 2.116 km). It is assumed to leave 1 track without restoring two-track traffic on the overpass, while adapting the design geometry of the track and the structure of the objects in such a way that the second track can be rebuilt in the future. It includes modernisation of co...
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 12,584 bytes −2,314 Removed claim: summary (P836): The project involves the modernisation of the railway establishment in Gorzów Wielkopolski (Lubuskie Province) on the section of line 203 from km 295,591 to km 297,707 (length 2.116 km).It is intended to leave the track 1 without reconstituting the dual track, while adapting the design of the track geometry and the construction of objects in a way that allows the restoration of the other track in the future.It is envisaged, inter alia, for the...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0810:08, 4 March 2020DG Regio talk contribs 13,184 bytes +2,314 Created claim: summary (P836): The project involves the modernisation of the railway establishment in Gorzów Wielkopolski (Lubuskie Province) on the section of line 203 from km 295,591 to km 297,707 (length 2.116 km).It is intended to leave the track 1 without reconstituting the dual track, while adapting the design of the track geometry and the construction of objects in a way that allows the restoration of the other track in the future.It is envisaged, inter alia, for the m...

18 February 2020

8 February 2020

31 January 2020

14 January 2020