Revision history of "Pomeranian Metropolitan Railway Stage I – revitalisation of “Kolei Kokoszkowska” Phase II – realisation of the project – FAZA II" (Q86011)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 62,627 bytes +920 Changed label, description and/or aliases in da, it, sk, hr, ga, et, pt, lv, fi, ro, lt, mt, sl, bg, cs, sv, fr, nl, de, el, es, hu, and other parts

24 October 2022

13 August 2022

  • curprev 17:2617:26, 13 August 2022DG Regio talk contribs 60,547 bytes +36,815 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 21:1621:16, 30 November 2021DG Regio talk contribs 16,057 bytes +1,844 Created claim: summary (P836): Phase II — Construction des arrêts de Gdynia Karwina et du stade Gdynia, travaux/services prévus dans le cadre de l’OPP & E 2014-2020. Les arrêts Gdynia Karwiny et Gdynia Stadion seront construits sur le tronçon de la ligne 201. À la suite de cet investissement, il est prévu de lancer une liaison ferroviaire régulière entre Gdańsk Główny et Gdańsk — Gdynia Główna. La liaison ferroviaire ci-dessus sera assurée par la ligne E65 (zone de Gdañsk), l...
  • curprev 21:1621:16, 30 November 2021DG Regio talk contribs 14,213 bytes +194 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 14,459 bytes +198 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 14,261 bytes −216 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 14,477 bytes +1,729 Created claim: summary (P836): Phase II – Construction of stops Gdynia Karwina and Gdynia Stadion, works/services planned to be carried out under the OPIiŚ 2014-2020. Gdynia Karwina and Gdynia Stadion stops will be built on the section of railway line No. 201. As a result of the investment, it is planned to open a regular railway link Gdańsk Główny – Gdańsk Airport – Gdynia Główna. The above railway connection will be operated by the E65 (Gdańsk and Żukowo Municipality) and l...
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 12,748 bytes −1,335 Removed claim: summary (P836): Phase II — Construction of Gdynia Karbura and Gdynia Stadium stops, works/services to be carried out under OPI & E 2014-2020.The section of the railway line No 201 will be constructed by Gdynia Karat and Gdynia Stadion.As a result of the investment carried out, it is planned to operate a regular rail link between Gdańsk Główny — Gdańsk Airport — Gdynia Główna.This railway link will be operated by line E65 (Gdansk area), which is generated by t...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0810:08, 4 March 2020DG Regio talk contribs 11,956 bytes +1,335 Created claim: summary (P836): Phase II — Construction of Gdynia Karbura and Gdynia Stadium stops, works/services to be carried out under OPI & E 2014-2020.The section of the railway line No 201 will be constructed by Gdynia Karat and Gdynia Stadion.As a result of the investment carried out, it is planned to operate a regular rail link between Gdańsk Główny — Gdańsk Airport — Gdynia Główna.This railway link will be operated by line E65 (Gdansk area), which is generated by the...

18 February 2020

8 February 2020

31 January 2020

14 January 2020