Revision history of "Modernisation of selected stations on railway line No. 7 on the Warsaw-Dorohusk section together with the railway station at Kraśnik Street located on line 68" (Q86007)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2522:25, 12 October 2024DG Regio talk contribs 65,277 bytes +12 Changed label, description and/or aliases in pt
  • curprev 22:2522:25, 12 October 2024DG Regio talk contribs 65,265 bytes +175 Set a claim value: summary (P836): O âmbito dos trabalhos deve incluir: — a construção ou reconstrução e modernização das instalações existentes de 17 estações abrangidas pelo âmbito do projeto, — a realização de obras de acabamento de interiores e exteriores de acordo com as especificações pormenorizadas desenvolvidas para cada uma das estações, — a adaptação dos objetos às necessidades das pessoas com deficiência em conformidade com as orientações da ETI-PRM, — o desenvolvimento de...

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 21:5021:50, 2 March 2023DG Regio talk contribs 63,117 bytes −2,416 Changed label, description and/or aliases in da, it, sk, cs, hr, es, fi, lv, fr, ro, pt, ga, lt, el, et, sl, bg, sv, de, hu, mt, nl, and other parts

24 October 2022

26 July 2022

  • curprev 04:2004:20, 26 July 2022DG Regio talk contribs 64,400 bytes +39,948 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1621:16, 30 November 2021DG Regio talk contribs 16,164 bytes +1,877 Created claim: summary (P836): La portée des travaux comprend: — construction ou reconstruction et modernisation de bâtiments existants de 17 stations relevant du projet, — réalisation de travaux de finition intérieure et extérieure conformément au cahier des charges détaillé établi pour chacune des stations, — adaptation des installations aux besoins des personnes handicapées conformément aux lignes directrices STI-PRM, — aménagement de zones autour des gares, y compris, ent...
  • curprev 21:1621:16, 30 November 2021DG Regio talk contribs 14,287 bytes +210 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 14,517 bytes +219 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 14,298 bytes −207 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 14,505 bytes +1,912 Created claim: summary (P836): The scope of work shall include: — the construction or reconstruction and modernisation of existing facilities of 17 stations falling within the scope of the project, – execution of finishing works of interiors and outdoors in accordance with the detailed specification developed for each of the stations, – adaptation of objects to the needs of disabled persons in accordance with the TSI-PRM guidelines, – the development of areas around the railw...
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 12,593 bytes −1,345 Removed claim: summary (P836): This work comprises:— construction or upgrading and upgrading of existing stations of 17 stations falling within the scope of the project — completion of interior and outdoor completion of buildings in accordance with the detailed specifications drawn up for each of the stations, — adaptation of facilities to the needs of persons with disabilities, in accordance with the TSI-PRM guidelines, — development of areas around the railway station inc...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0810:08, 4 March 2020DG Regio talk contribs 11,808 bytes +1,345 Created claim: summary (P836): This work comprises:— construction or upgrading and upgrading of existing stations of 17 stations falling within the scope of the project — completion of interior and outdoor completion of buildings in accordance with the detailed specifications drawn up for each of the stations, — adaptation of facilities to the needs of persons with disabilities, in accordance with the TSI-PRM guidelines, — development of areas around the railway station inclu...

18 February 2020

8 February 2020

31 January 2020

14 January 2020