Revision history of "Modernisation of selected stations on railway line No. 447 on the Brwinów – Jaktorów section and at the railway line No. 3 on the section Ożarów Mazowiecki – Kornelin" (Q86002)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2522:25, 12 October 2024DG Regio talk contribs 78,164 bytes −2 Changed label, description and/or aliases in pt
  • curprev 22:2522:25, 12 October 2024DG Regio talk contribs 78,166 bytes −767 Set a claim value: summary (P836): O projeto inclui a reconstrução das estações ferroviárias de 8 estações ferroviárias, ou seja: Filme, Brwin, Jaktorów, Kornelin, Milanówek, Ożarów Mazowiecki, Płochocin, Sochaczew. O âmbito dos trabalhos deve incluir: — demolição de edifícios existentes e construção de novas estações do sistema (Kornelin, Milanówek), — reconstrução e modernização de instalações existentes (Błonie, Brwinów, Jaktorów, Ożarów Mazowiecki, Płochocin, Sochaczew), — execuç...

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

3 March 2023

  • curprev 00:1000:10, 3 March 2023DG Regio talk contribs 76,234 bytes +11,183 Changed label, description and/or aliases in lt, lv, pt, mt, de, es, ga, sl, fr, fi, hr, sk, it, el, nl, bg, et, cs, da, ro, hu, sv, and other parts

24 October 2022

26 July 2022

  • curprev 04:2004:20, 26 July 2022DG Regio talk contribs 63,153 bytes +34,998 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 21:1621:16, 30 November 2021DG Regio talk contribs 18,766 bytes +2,439 Created claim: summary (P836): Le projet prévoit la reconstruction de 8 gares ferroviaires, à savoir: Membrane, Brwinów, Jaktorów, Kornelin, Milanówek, Ożarów Mazowiecki, Płochocin, Sochaczew. La portée des travaux comprend: — la démolition d’installations existantes et la construction de nouvelles stations-systèmes (Kornelin, Milanówek), — la reconstruction et la modernisation d’installations existantes (Błonie, Brwinów, Jaktorów, Ożarów Mazowiecki, Płochocin, Sochaczew), —...
  • curprev 21:1621:16, 30 November 2021DG Regio talk contribs 16,327 bytes +251 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 16,516 bytes +234 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 16,282 bytes −206 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 16,488 bytes +1,628 Created claim: summary (P836): The project includes the reconstruction of the railway stations of 8 railway stations, i.e.: Film, Brwin, Jaktorów, Kornelin, Milanówek, Ożarów Mazowiecki, Płochocin, Sochaczew. The scope of work shall include: — demolition of existing buildings and construction of new system stations (Kornelin, Milanówek), – reconstruction and modernisation of existing facilities (Błonie, Brwinów, Jaktorów, Ożarów Mazowiecki, Płochocin, Sochaczew), – execution...
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 14,860 bytes −1,506 Removed claim: summary (P836): The project involves the upgrading of train stations of 8 railway stations, i.e.:Trees, Brins, Jaktorów, Kornein, Milanówek, Ożarów Mazowiecki, Pachocina, Sochaczew.This work comprises:— demolition of existing plants and the construction of new system stations (Kornelin, Milanówek), — reconstruction and modernisation of existing plants (Below, Brwinów, Jaktorów, Ożarów Mazowiecki, Pachocina, Sochaczew), — construction of interior finishes (tur...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0810:08, 4 March 2020DG Regio talk contribs 13,410 bytes +1,506 Created claim: summary (P836): The project involves the upgrading of train stations of 8 railway stations, i.e.:Trees, Brins, Jaktorów, Kornein, Milanówek, Ożarów Mazowiecki, Pachocina, Sochaczew.This work comprises:— demolition of existing plants and the construction of new system stations (Kornelin, Milanówek), — reconstruction and modernisation of existing plants (Below, Brwinów, Jaktorów, Ożarów Mazowiecki, Pachocina, Sochaczew), — construction of interior finishes (turnk...

18 February 2020

8 February 2020

31 January 2020

14 January 2020