Revision history of "Improvement of the capacity of the E 20 railway line on the Warsaw-Mińsk Mazowiecki section, stage I" (Q85992)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2522:25, 12 October 2024DG Regio talk contribs 46,667 bytes −9 Changed label, description and/or aliases in pt
  • curprev 22:2522:25, 12 October 2024DG Regio talk contribs 46,676 bytes −4 Set a claim value: summary (P836): Âmbito do projeto POIiŚ 5.1-18 Melhorar a capacidade da linha ferroviária E 20 no troço Varsóvia-Mińsk Mazowiecki, a fase I inclui, entre outros, a substituição do pavimento da via, do bloco da linha, da catenária, a construção de novos equipamentos Srk, a substituição de interruptores e a construção de instalações de engenharia no lado oriental do nó ferroviário de Varsóvia.

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 45,427 bytes +87 Changed label, description and/or aliases in lv, da, bg, sk, hr, et, ro, es, lt, pt, hu, ga, fr, sl, sv, de, nl, el, mt, fi, cs, and other parts

24 October 2022

27 September 2022

13 August 2022

  • curprev 17:2617:26, 13 August 2022DG Regio talk contribs 44,529 bytes +25,620 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1521:15, 30 November 2021DG Regio talk contribs 13,271 bytes +1,277 Created claim: summary (P836): La portée du projet OPIiE 5.1-18 Amélioration de la capacité de la ligne de chemin de fer E 20 sur le tronçon Varsovie — Minsk Mazowiecki, étape I comprend, entre autres, le remplacement des surfaces de voie, les verrouillages de ligne, la ligne aérienne de contact, la construction de nouveaux dispositifs d’archet, le remplacement des branchements et la construction de structures techniques du côté est de la jonction ferroviaire de Varsovie., tr...
  • curprev 21:1521:15, 30 November 2021DG Regio talk contribs 11,994 bytes +174 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 12,260 bytes +161 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 12,099 bytes −163 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 12,262 bytes +1,191 Created claim: summary (P836): Scope of the POIiŚ Project 5.1-18 Improving the capacity of the E 20 railway line on the Warsaw-Mińsk Mazowiecki section, stage I includes, among others, replacement of track pavement, line block, overhead contact line, construction of new srk equipment, replacement of switches and construction of engineering facilities on the eastern side of the Warsaw Railway Node., translated_summary
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 11,071 bytes −777 Removed claim: summary (P836): The scope of the OPI & E project 5.1-18, Improvement of the capacity of the E 20 railway line on section Warszawa — Mińsk Mazowiecki, stage I includes, inter alia, replacement of track paving, block blocking, overhead contact line, construction of new traffic signalling equipment, replacement of switches and construction of civil engineering structures on the eastern side of Warsaw Railway Junction., remove_old_english_translation

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0810:08, 4 March 2020DG Regio talk contribs 10,128 bytes +777 Created claim: summary (P836): The scope of the OPI & E project 5.1-18, Improvement of the capacity of the E 20 railway line on section Warszawa — Mińsk Mazowiecki, stage I includes, inter alia, replacement of track paving, block blocking, overhead contact line, construction of new traffic signalling equipment, replacement of switches and construction of civil engineering structures on the eastern side of Warsaw Railway Junction., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020