Revision history of "Route of the Łódź Railway Node (TEN-T), stage II, section Łódź Fabryczna – Łódź Kaliska/Łódź Żabieniec" (Q85990)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)

12 October 2024

  • curprev 22:2522:25, 12 October 2024DG Regio talk contribs 72,876 bytes −4 Changed label, description and/or aliases in pt
  • curprev 22:2522:25, 12 October 2024DG Regio talk contribs 72,880 bytes +52 Set a claim value: summary (P836): O projeto tem por objeto a construção de uma linha ferroviária no túnel linear (REG-A) a partir da estação de Łódź Kaliska e da paragem de passageiros de Łódź Żabieniec até à estação de Łódź Fabryczna, com a construção de paragens na zona das ruas Ogrodowa/Karskiego/Drewnowska e na zona da intersecção das ruas Zielona e Zachodni. Para uma linha ferroviária no túnel de diâmetro, são especificadas as seguintes condições técnicas: • Velocidade máxima d...

12 March 2024

15 January 2024

13 December 2023

28 June 2023

10 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 70,795 bytes −1,019 Changed label, description and/or aliases in da, it, sk, fi, hr, lt, et, es, hu, pt, fr, ro, ga, lv, sv, bg, nl, de, sl, cs, el, mt, and other parts

24 October 2022

27 September 2022

26 July 2022

  • curprev 04:2004:20, 26 July 2022DG Regio talk contribs 71,006 bytes +44,319 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

8 February 2022

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1521:15, 30 November 2021DG Regio talk contribs 16,383 bytes +2,311 Created claim: summary (P836): L’objet de ce projet est la construction d’une ligne de chemin de fer dans le tunnel de ligne (REG-A) à partir de la gare de Łódź Kaliska et de l’arrêt de voyageurs de Łódžabieniec jusqu’à la gare de Łódź Fabryczna, ainsi que la construction d’arrêts dans la zone des rues Ogrodowa/Karskigo/Drewnowska et dans la zone de l’intersection des rues Zielona et occidentale. Pour la ligne de chemin de fer située au milieu du tunnel, les conditions techni...
  • curprev 21:1521:15, 30 November 2021DG Regio talk contribs 14,072 bytes +174 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 14,338 bytes +177 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 14,161 bytes −216 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 14,377 bytes +2,157 Created claim: summary (P836): The subject of the project is the construction of a railway line in the linear tunnel (REG-A) from the Łódź Kaliska station and from the Łódź Żabieniec passenger stop to the Łódź Fabryczna station with the construction of stops in the area of Ogrodowa/Karskiego/Drewnowska Streets and in the area of the intersection of Zielona and Zachodni streets. For a railway line in the diameter tunnel, the following technical conditions are specified: • Max...
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 12,220 bytes −1,607 Removed claim: summary (P836): The project concerns the construction of a railway line in the linear tunnel (REG-A) from the Łódź Kalisz station and from Łódź Żabeceliec to Łódź Fabryczna, with the construction of stops in the area of street garden/Karski/Dresden and in the area of the intersection of Green and West streets.For the railway line, the following shore side technical conditions have been defined in the tunnel tunnel:• Max design speed: 100 km/h.• Authorised axl...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0810:08, 4 March 2020DG Regio talk contribs 12,107 bytes +1,607 Created claim: summary (P836): The project concerns the construction of a railway line in the linear tunnel (REG-A) from the Łódź Kalisz station and from Łódź Żabeceliec to Łódź Fabryczna, with the construction of stops in the area of street garden/Karski/Dresden and in the area of the intersection of Green and West streets.For the railway line, the following shore side technical conditions have been defined in the tunnel tunnel:• Max design speed: 100 km/h.• Authorised axle...

18 February 2020

8 February 2020

31 January 2020

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)