Revision history of "Construction of the Bolków ring road within DK 3/5" (Q85976)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 69,383 bytes +4 Changed label, description and/or aliases in pt
  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 69,379 bytes +33 Set a claim value: summary (P836): A parte principal do projeto é a construção da estrada circular de Bolków na estrada nacional n.o 3, com parâmetros da estrada da classe GP (5,68 km), juntamente com a reconstrução e extensão da estrada nacional n.o 5 (2,11 km) aos parâmetros da classe GP. Este desvio percorre uma nova pegada no lado noroeste, sul e parcialmente leste da cidade e do município de Bolków. O anel viário liga-se à dk n.o 5 existente na parte sudeste da área analisada, q...

7 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 68,093 bytes −495 Changed label, description and/or aliases in da, it, sk, fi, sv, ga, cs, sl, hu, lv, el, ro, hr, pt, fr, nl, de, es, lt, et, bg, mt, and other parts

24 October 2022

26 July 2022

  • curprev 04:1904:19, 26 July 2022DG Regio talk contribs 67,772 bytes +42,156 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1421:14, 30 November 2021DG Regio talk contribs 16,172 bytes +2,280 Created claim: summary (P836): La partie principale du projet est la construction du périphérique Bolkowa le long de la route nationale no 3 avec les paramètres de la route PG (5,68 km) ainsi que la reconstruction et l’extension de la route nationale 5 (2,11 km) aux paramètres de la classe PG. Ce contournement suit un nouveau sentier au nord-ouest, au sud et en partie à l’est de la ville et de la municipalité de Bolków. Le contournement se connecte avec le dk no 5 existant si...
  • curprev 21:1421:14, 30 November 2021DG Regio talk contribs 13,892 bytes +109 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 17:2217:22, 14 October 2020DG Regio talk contribs 14,223 bytes +2,156 Created claim: summary (P836): The main part of the project is the construction of the Bolków ring road within national road No. 3 with parameters of the GP class road (5.68 km) together with the reconstruction and extension of the national road 5 (2.11 km) to the GP class parameters. This bypass runs a new footprint on the north-western, south and partly eastern side of the town and the municipality of Bolków. The ring road connects with the existing dk No. 5 located on the...
  • curprev 17:2217:22, 14 October 2020DG Regio talk contribs 12,067 bytes −1,741 Removed claim: summary (P836): The main part of the project is the construction of the Bolkov bypass along national road No 3 on the parameters of the class of road class GP (5.68 km) with the reconstruction and extension of the national road 5 (2.11 km) to the parameters of the class GP.The bypass in question follows a new approach following the north-western, southern and partly eastern part of the city and the municipality of Bolków.The bypass is connected to the existin...
  • curprev 15:1215:12, 14 October 2020DG Regio talk contribs 13,808 bytes +110 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1215:12, 14 October 2020DG Regio talk contribs 13,698 bytes −110 Changed label, description and/or aliases in 1 language: remove_english_label

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0110:01, 4 March 2020DG Regio talk contribs 12,095 bytes +1,741 Created claim: summary (P836): The main part of the project is the construction of the Bolkov bypass along national road No 3 on the parameters of the class of road class GP (5.68 km) with the reconstruction and extension of the national road 5 (2.11 km) to the parameters of the class GP.The bypass in question follows a new approach following the north-western, southern and partly eastern part of the city and the municipality of Bolków.The bypass is connected to the existing...

18 February 2020

8 February 2020

31 January 2020

14 January 2020