Revision history of "Construction of the Kłodzka ring road in the course of 33 and 46" (Q85974)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 75,689 bytes −6 Changed label, description and/or aliases in pt
  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 75,695 bytes −19 Set a claim value: summary (P836): A parte principal do projeto é a construção da estrada circular de Kłodzka na estrada nacional n.o 33, com os parâmetros da estrada da classe GP, juntamente com a construção do conector na dk 46, com os parâmetros da estrada da classe G, com um comprimento total de 9,191 km. O projeto é complementado pela renovação do troço da estrada nacional n.o 33, com uma extensão aproximada de 2 388 milhas. Todo o projeto está localizado na cidade de Kłodzko e...

20 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 72,960 bytes +318 Changed label, description and/or aliases in da, it, sk, es, de, cs, lt, sv, ga, bg, fi, nl, lv, el, ro, hr, et, pt, fr, sl, hu, mt, and other parts

24 October 2022

13 August 2022

  • curprev 17:2617:26, 13 August 2022DG Regio talk contribs 71,825 bytes +44,779 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1421:14, 30 November 2021DG Regio talk contribs 16,759 bytes +2,513 Created claim: summary (P836): La partie principale du projet est la construction du périphérique de Kłodzka le long de la route nationale no 33 avec les paramètres de la route PG, ainsi que la construction d’un connecteur à l’intérieur de la dk 46 avec les paramètres de la route de classe G d’une longueur totale de 9,91 km. L’investissement est complété par la rénovation du tronçon de la route nationale no 33 d’une longueur d’env. 2,388 km. L’ensemble du projet est situé dan...
  • curprev 21:1421:14, 30 November 2021DG Regio talk contribs 14,246 bytes +135 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1215:12, 14 October 2020DG Regio talk contribs 14,551 bytes +124 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1215:12, 14 October 2020DG Regio talk contribs 14,427 bytes −122 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1215:12, 14 October 2020DG Regio talk contribs 14,549 bytes +2,399 Created claim: summary (P836): The main part of the project is the construction of the Kłodzka ring road within the national road No. 33 with the parameters of the GP class road together with the construction of the connector within dk 46 with the parameters of the G-class road with a total length of 9.191 km. The project is complemented by the renovation of the section of national road No. 33 with a length of approx. It’s 2,388 miles. The entire project is located in the tow...
  • curprev 15:1215:12, 14 October 2020DG Regio talk contribs 12,150 bytes −1,815 Removed claim: summary (P836): The main part of the project is the construction of a Kłodzka bypass on national road No 33, on the parameters of a class of road of a class GP with a connector in the course of a 46 km route with a total length of 9.191 km.The complement of the investment is the renovation of the section of the national road No 33 of some length.2.388 km.The whole project is located in the town of Kłodzko and the municipality of Kłodzko in the district of the...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0110:01, 4 March 2020DG Regio talk contribs 12,252 bytes +1,815 Created claim: summary (P836): The main part of the project is the construction of a Kłodzka bypass on national road No 33, on the parameters of a class of road of a class GP with a connector in the course of a 46 km route with a total length of 9.191 km.The complement of the investment is the renovation of the section of the national road No 33 of some length.2.388 km.The whole project is located in the town of Kłodzko and the municipality of Kłodzko in the district of the D...

18 February 2020

8 February 2020

31 January 2020

14 January 2020