Revision history of "Modernisation of the eastern DK exit No. 22 in Gorzów Wlkp. on the section from the Siberian roundabout to the city limits" (Q85967)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 47,871 bytes −9 Changed label, description and/or aliases in pt
  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 47,880 bytes −17 Set a claim value: summary (P836): Este investimento consiste na reconstrução das ruas Walczaka, Bierzarina e Łukasiński na estrada nacional n.o 22 em Gorzów Wielkopolski, num troço de cerca de 3,6 km. Após a conclusão do investimento, toda a secção abrangida pelo projeto será bidirecional, bidirecional, classe de estrada GP e capacidade de carga de 115kN/eixo.

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 18:5318:53, 2 March 2023DG Regio talk contribs 45,142 bytes +436 Changed label, description and/or aliases in lv, sk, it, da, el, hu, pt, et, sv, lt, ga, sl, hr, de, es, nl, cs, bg, mt, ro, fi, fr, and other parts

24 October 2022

26 July 2022

  • curprev 04:1904:19, 26 July 2022DG Regio talk contribs 43,887 bytes +25,110 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1321:13, 30 November 2021DG Regio talk contribs 13,231 bytes +1,240 Created claim: summary (P836): Cet investissement consiste en la reconstruction des rues Walczaka, Bierzarina et Łukasiński le long de la route nationale no 22 à Gorzów Wielkopolski, sur un tronçon d’environ 3,6 km. Après l’achèvement de l’investissement, l’ensemble du tronçon couvert par le projet sera une route bidirectionnelle, une route à deux voies, elle aura une classe de route PG et une capacité de charge de 115kN/essieu., translated_summary
  • curprev 21:1321:13, 30 November 2021DG Regio talk contribs 11,991 bytes +186 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1215:12, 14 October 2020DG Regio talk contribs 12,245 bytes +183 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1215:12, 14 October 2020DG Regio talk contribs 12,062 bytes −187 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1215:12, 14 October 2020DG Regio talk contribs 12,249 bytes +1,150 Created claim: summary (P836): This investment consists of reconstruction of Walczaka, Bierzarina and Łukasiński streets within national road No. 22 in Gorzów Wielkopolski, on a stretch of about 3.6 km. After completion of the investment, the entire section covered by the project will be two-way, two-way road, GP road class and load capacity of 115kN/axis., translated_summary
  • curprev 15:1215:12, 14 October 2020DG Regio talk contribs 11,099 bytes −706 Removed claim: summary (P836): The investment in question consists of changing the streets of the fighting streets, Bierzrina and Łukasiński in National Road No 22 in Gorzów Wielkopolski, on a section of approximately 3.6 km.At the end of the investment, the entire project segment will be a two-way, dual carriageway, a GP road class and a load of 115 kN/axle., remove_old_english_translation

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0110:01, 4 March 2020DG Regio talk contribs 10,089 bytes +706 Created claim: summary (P836): The investment in question consists of changing the streets of the fighting streets, Bierzrina and Łukasiński in National Road No 22 in Gorzów Wielkopolski, on a section of approximately 3.6 km.At the end of the investment, the entire project segment will be a two-way, dual carriageway, a GP road class and a load of 115 kN/axle., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020