Revision history of "Biskupia Górka viaduct in Gdańsk" (Q85959)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 49,176 bytes +32 Set a claim value: summary (P836): Âmbito do robô incluído no projeto: demolição do viaduto existente e construção de novos viadutos rodoviários ao longo da rua Trakt Św. Wojciecha, reconstrução da secção de Trakt Św. Wojciecha, Okopowa, Zaroślak, Toruńska; reconstrução da intersecção das ruas Trakt Św.Wojciecha-Okopowa-Torunska e Trakt Św. Wojciecha-Zaroślak; reconstrução do sistema rodoviário em torno do Bastião Branco; construção de um troço da nova rua Podwale Grodzkie; construçã...

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

5 November 2022

24 October 2022

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1321:13, 30 November 2021DG Regio talk contribs 13,641 bytes +1,434 Created claim: summary (P836): Portée du robot couvert par le projet: démolition du viaduc existant et construction de nouveaux viaducs routiers dans la rue Trakt. Wojciecha, reconstruction du tronçon de la rue St. Trakt Wojciecha, Okopowa, Zaszczak, Toruńska; reconstruction de l’intersection de Trakt St.Wojciecha-Okopowa-Toruńska et St. Trakt St. Wojciecha-Zaszczak; reconstruction du réseau routier autour de la Tour Blanche; construction du nouveau tronçon de la rue Podwale...
  • curprev 21:1321:13, 30 November 2021DG Regio talk contribs 12,207 bytes +92 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 12,555 bytes +93 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 12,462 bytes −89 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 12,551 bytes +1,441 Created claim: summary (P836): Scope of the robot included in the project: demolition of the existing viaduct and construction of new road viaducts along the street Trakt Św. Wojciecha, reconstruction of the section of Trakt Św. Wojciecha, Okopowa, Zaroślak, Toruńska; reconstruction of the intersection of streets Trakt Św.Wojciecha-Okopowa-Torunska and Trakt Św. Wojciecha-Zaroślak; reconstruction of the road system around the White Bastion; construction of a section of the ne...
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 11,110 bytes −1,020 Removed claim: summary (P836): The scope of the robot covered by the project:demolition of the existing viaduct and the construction of new road viaducts in the course of the Traction St.Wojciech, upgrading the section of the ‘Trakt Św’ street.Wojciech, kowita, Zierlak, Toruńska;reconstruction of the intersection of street Trakt Św.Wojciechowski and the Coptic streets and the streets of Trakt Św.Wojciech Zierlak;reconstruction of the road system around the White Paper;const...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0110:01, 4 March 2020DG Regio talk contribs 10,412 bytes +1,020 Created claim: summary (P836): The scope of the robot covered by the project:demolition of the existing viaduct and the construction of new road viaducts in the course of the Traction St.Wojciech, upgrading the section of the ‘Trakt Św’ street.Wojciech, kowita, Zierlak, Toruńska;reconstruction of the intersection of street Trakt Św.Wojciechowski and the Coptic streets and the streets of Trakt Św.Wojciech Zierlak;reconstruction of the road system around the White Paper;constru...

18 February 2020

8 February 2020

31 January 2020

14 January 2020