Revision history of "Improving the communication connection between the islands of Uznam and Wolin in Świnoujście – construction of a tunnel under Świna" (Q85957)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 45,195 bytes +1 Changed label, description and/or aliases in pt
  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 45,194 bytes +1 Set a claim value: summary (P836): Presume-se que um túnel de uma única nave seja construído com a tecnologia de blindagem oca TBM. São 1,44 milhas. Os outros elementos do sistema rodoviário serão: Estradas de acesso ao túnel: Reconhecerei as estradas de acesso ao túnel com portagem, as estradas de acesso à ilha Wolin ao túnel e à rotunda.

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 43,939 bytes +91 Changed label, description and/or aliases in da, it, sk, sv, fi, el, et, cs, fr, bg, ga, pt, lv, de, lt, es, ro, hr, hu, nl, sl, mt, and other parts

24 October 2022

26 July 2022

  • curprev 04:1904:19, 26 July 2022DG Regio talk contribs 43,025 bytes +24,759 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1321:13, 30 November 2021DG Regio talk contribs 13,091 bytes +1,149 Created claim: summary (P836): Tunnel à une nage est supposé dans la technologie de disque creux TBM, long. 1,44 km. Les autres éléments du système routier seront les suivants: routes d’accès au tunnel: Les routes d’accès de l’île d’Uznam au tunnel avec la station de péage, les routes d’accès de l’île Wolin au tunnel et au rond-point., translated_summary
  • curprev 21:1321:13, 30 November 2021DG Regio talk contribs 11,942 bytes +195 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 12,187 bytes +196 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 11,991 bytes −230 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 12,221 bytes +1,119 Created claim: summary (P836): A single-nave tunnel is assumed to be constructed in the TBM hollow shield technology. It’s 1,44 miles. The other elements of the road system will be: access roads to the tunnel: I will recognise access roads to the tunnel with toll station, Wolin Island access roads to the tunnel and roundabout., translated_summary
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 11,102 bytes −687 Removed claim: summary (P836): It is assumed that the one-on-bed tunnel in the TBM panel will be performed.1.44 km.The other components of the road system will be:access routes to the tunnel:the island is familiar with the access roads to the tunnel along with the toll station, the island of Wolin access roads to the tunnel and the roundabout., remove_old_english_translation

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0110:01, 4 March 2020DG Regio talk contribs 10,076 bytes +687 Created claim: summary (P836): It is assumed that the one-on-bed tunnel in the TBM panel will be performed.1.44 km.The other components of the road system will be:access routes to the tunnel:the island is familiar with the access roads to the tunnel along with the toll station, the island of Wolin access roads to the tunnel and the roundabout., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020