Revision history of "Extension of the National Road No. 81 from the junction of the A4 motorway from DK86 to the construction of the junction from ul. The National Army, stage IV – Expansion of DK81 on the section of ul. Kosciuszko with the construction of the Home Army jun" (Q85956)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 47,824 bytes +34 Changed label, description and/or aliases in pt
  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 47,790 bytes +10 Set a claim value: summary (P836): A parte principal do projecto é a extensão do troço da estrada nacional n.o 81 (ul. Kościuszki) com um comprimento de 1,44 km, juntamente com a construção de um WB de dois andares do tipo «Karo» no cruzamento com a rua Armii Krajowa com uma rotunda de turbina de duas faixas, que se forma através do acesso da DK 86 à autoestrada A4.

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 46,527 bytes −130 Changed label, description and/or aliases in da, it, sk, es, lt, sv, cs, bg, de, fi, ga, hr, el, lv, et, pt, ro, fr, nl, hu, sl, mt, and other parts

24 October 2022

26 July 2022

  • curprev 04:1904:19, 26 July 2022DG Regio talk contribs 45,848 bytes +26,614 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1321:13, 30 November 2021DG Regio talk contribs 13,431 bytes +1,151 Created claim: summary (P836): La partie principale du projet est l’extension du tronçon de la route nationale no 81 (ul. Kościuszki) d’une longueur de 1,44 km avec la construction d’un double niveau WB type «Karo» à la jonction avec la rue Armii Krajowej avec un rond-point à turbine à deux voies, qui est par l’accès DK 86 à l’autoroute A4., translated_summary
  • curprev 21:1321:13, 30 November 2021DG Regio talk contribs 12,280 bytes +330 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 12,390 bytes +320 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 12,070 bytes −309 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 12,379 bytes +1,141 Created claim: summary (P836): The main part of the project is the extension of the section of national road No. 81 (ul. Kościuszki) with a length of 1.44 km along with the construction of a two-storey “Karo” type WB at the junction with Armii Krajowa Street with a two-lane turbine roundabout, which forms through DK 86 access to the A4 motorway., translated_summary
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 11,238 bytes −719 Removed claim: summary (P836): The main part of the project is the extension of the section of the national road No 81 (ul.Kościuszki) with a length of 1.44 km with the construction of a dual-layer WB “Karo” type at the intersection with the street of the National Army Commander with a two-lane roundabout, which represented in DK 86 a motorway access to the A4 motorway., remove_old_english_translation

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0110:01, 4 March 2020DG Regio talk contribs 10,239 bytes +719 Created claim: summary (P836): The main part of the project is the extension of the section of the national road No 81 (ul.Kościuszki) with a length of 1.44 km with the construction of a dual-layer WB “Karo” type at the intersection with the street of the National Army Commander with a two-lane roundabout, which represented in DK 86 a motorway access to the A4 motorway., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020