Revision history of "Reconstruction of national road No 73 to national road No 94 in Tarnów – stage I" (Q85947)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

12 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 42,508 bytes +456 Changed label, description and/or aliases in da, it, sk, ga, lv, sv, cs, ro, fi, sl, es, lt, de, et, el, bg, hr, mt, fr, nl, pt, hu, and other parts

24 October 2022

26 July 2022

  • curprev 04:1804:18, 26 July 2022DG Regio talk contribs 41,241 bytes +23,383 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1321:13, 30 November 2021DG Regio talk contribs 12,862 bytes +1,125 Created claim: summary (P836): L’objectif du projet est d’améliorer la connexion de la ville au réseau routier RTE-T en augmentant la capacité de 73 DK en km 0 + 590 km 1 + 555,49 km par kilomètre local, en réduisant les coûts d’exploitation des véhicules et en améliorant la sécurité dans le tronçon à l’étude., translated_summary
  • curprev 21:1321:13, 30 November 2021DG Regio talk contribs 11,737 bytes +147 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 12,030 bytes +142 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 11,888 bytes −154 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 12,042 bytes +1,074 Created claim: summary (P836): The aim of the project is to improve the connectivity of the city to the TEN-T road network by increasing the capacity of DK73 in km 0+ 590-km 1+ 555.99 per local kilometre, reducing vehicle operating costs and improving safety in the analysed section., translated_summary
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 10,968 bytes −678 Removed claim: summary (P836): The aim of the project is to improve the quality of the city’s connection to the TEN-T road network by increasing the capacity of the DK73 in km 0 + 590 km + 1 + 555,99 per kilometre of local distance, a reduction in the costs of operating the vehicles and improving safety on the calculated section., remove_old_english_translation

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0110:01, 4 March 2020DG Regio talk contribs 9,935 bytes +678 Created claim: summary (P836): The aim of the project is to improve the quality of the city’s connection to the TEN-T road network by increasing the capacity of the DK73 in km 0 + 590 km + 1 + 555,99 per kilometre of local distance, a reduction in the costs of operating the vehicles and improving safety on the calculated section., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020