Revision history of "Construction of Inowrocław and Brodnica bypasses within DK15" (Q85943)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 64,198 bytes −13 Changed label, description and/or aliases in pt
  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 64,211 bytes −9 Set a claim value: summary (P836): O projeto visa a construção da circunvalação de Inowrocław ao longo da estrada nacional n.o 15 e da estrada nacional n.o 25 (DK15 e DK25) e da estrada circular de Brodnica na estrada nacional n.o 15 (DK 15). O comprimento da estrada circular de Brodnica é de 1,48 km e existe uma secção transversal ao longo de todo o troço com uma faixa divisória na área de intersecção. O desvio de Inowrocław, com um comprimento de 22,97 km, terá uma secção transvers...

23 March 2024

15 January 2024

13 December 2023

28 June 2023

10 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

  • curprev 19:4819:48, 2 March 2023DG Regio talk contribs 59,963 bytes +1,318 Changed label, description and/or aliases in lv, it, da, sk, ro, pt, fi, ga, sv, et, es, hr, fr, sl, el, nl, hu, cs, bg, de, mt, lt, and other parts

24 October 2022

26 July 2022

  • curprev 04:1804:18, 26 July 2022DG Regio talk contribs 57,458 bytes +33,254 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1321:13, 30 November 2021DG Regio talk contribs 16,466 bytes +1,813 Created claim: summary (P836): Le projet vise à construire le périphérique d’Inowrocław le long de la route nationale 15 et la route nationale no 25 (DK15 et DK25) et le périphérique Brodnica le long de la route nationale no 15 (DK 15). La longueur du périphérique Brodnica est de 1,48 km, le long de la section entière, il y a une section à une voie avec une bande de séparation dans la zone d’intersections. D’autre part, le contournement prévu d’Inowrocław, d’une longueur de 2...
  • curprev 21:1321:13, 30 November 2021DG Regio talk contribs 14,653 bytes +146 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 14,947 bytes +120 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 14,827 bytes −107 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 14,934 bytes +1,659 Created claim: summary (P836): The project aims at the construction of the Inowrocław bypass along national road No 15 and national road No 25 (DK15 and DK25) and the Brodnica ring road within national road 15 (DK 15). The length of the Brodnica ring road is 1.48 km, and there is a cross-section along the whole section with a dividing strip in the intersection area. The Inowrocław bypass, with a length of 22.97 km, will have a two-way cross-section with two lanes and a dividi...
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 13,275 bytes −1,302 Removed claim: summary (P836): The project aims at the construction of the Inowrocław bypass on national road No 15 and national road No 25 (DK15 and DK25) and the Brodnica ring road on national road No 15 (DK 15).The length of the Buddhist bypass to be built is 1.48 km, for the entire section a single-carriageway section is provided with a dividing strip in the crossing area.By contrast, the projected Inowrocław bypass, which will have a length of 22.97 km, will have a dua...

23 September 2020

15 July 2020

22 June 2020

16 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0110:01, 4 March 2020DG Regio talk contribs 11,660 bytes +1,302 Created claim: summary (P836): The project aims at the construction of the Inowrocław bypass on national road No 15 and national road No 25 (DK15 and DK25) and the Brodnica ring road on national road No 15 (DK 15).The length of the Buddhist bypass to be built is 1.48 km, for the entire section a single-carriageway section is provided with a dividing strip in the crossing area.By contrast, the projected Inowrocław bypass, which will have a length of 22.97 km, will have a dual...

18 February 2020

8 February 2020

31 January 2020

14 January 2020