Revision history of "Construction of the S1 expressway. Pyrzowice (at. Airport) – Podwarpie" (Q85938)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 64,277 bytes −3 Changed label, description and/or aliases in pt
  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 64,280 bytes −70 Set a claim value: summary (P836): O objeto deste projeto é a adição da segunda faixa de rodagem da via rápida S1 no troço do nó «aeroporto» – nó Podwarpie do km 2 + 158 ao km 11 + 880, ou seja, 9,72 km de comprimento, com a construção de instalações de engenharia, equipamento de proteção ambiental, equipamento rodoviário (desidratação, iluminação rodoviária) e reconstrução das infraestruturas técnicas existentes. A via rápida S1 funciona atualmente no troço acima referido como via r...

7 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 61,234 bytes +528 Changed label, description and/or aliases in da, it, sk, lv, ga, ro, et, sl, sv, fi, cs, mt, de, hr, lt, el, bg, es, hu, pt, fr, nl, and other parts

24 October 2022

13 August 2022

  • curprev 17:2617:26, 13 August 2022DG Regio talk contribs 59,894 bytes +36,113 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 21:1321:13, 30 November 2021DG Regio talk contribs 16,093 bytes +1,967 Created claim: summary (P836): Ce projet a pour objet la construction d’une deuxième chaussée de l’autoroute S1 sur le tronçon de la jonction «Aéroport» — jonction Podwarpie du km 2 + 158 au km 11 + 880, soit 9,72 km de long, ainsi que la construction de structures techniques, de dispositifs de protection de l’environnement, d’équipements routiers (désarrosage, éclairage routier) et la reconstruction des infrastructures techniques existantes. La voie express S1 fonctionne act...
  • curprev 21:1321:13, 30 November 2021DG Regio talk contribs 14,126 bytes +136 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 14,430 bytes +131 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 14,299 bytes −123 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 14,422 bytes +1,856 Created claim: summary (P836): The subject of this project is the addition of the second carriageway of the S1 expressway on the section of the “Airport” junction – Podwarpie junction from km 2 + 158 to km 11+ 880, i.e. 9.72 km long with the construction of engineering facilities, environmental protection equipment, road-related equipment (dehydration, road lighting) and reconstruction of existing technical infrastructure. The S1 expressway currently operates on the above sec...
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 12,566 bytes −1,409 Removed claim: summary (P836): The object of this project is a second carriageway of the S1 expressway, along the section ‘Lotnisko’ interchange — ‘Podwarpie’ interchange from km 2 + 158 to km 11 + 880, i.e. 9.72 km long with the construction of engineering structures, environmental equipment, road lighting equipment (drainage, road lighting) and the construction of the existing technical infrastructure.The expressway S1 operates at present on the above section as a single-...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0110:01, 4 March 2020DG Regio talk contribs 11,855 bytes +1,409 Created claim: summary (P836): The object of this project is a second carriageway of the S1 expressway, along the section ‘Lotnisko’ interchange — ‘Podwarpie’ interchange from km 2 + 158 to km 11 + 880, i.e. 9.72 km long with the construction of engineering structures, environmental equipment, road lighting equipment (drainage, road lighting) and the construction of the existing technical infrastructure.The expressway S1 operates at present on the above section as a single-ca...

18 February 2020

8 February 2020

31 January 2020

14 January 2020