Revision history of "Construction of the Szczecinek ring road within S11" (Q85935)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 83,255 bytes +2 Changed label, description and/or aliases in pt
  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 83,253 bytes −122 Set a claim value: summary (P836): Este projeto abrange a construção da circunvalação de Szczecinek ao longo da via rápida S11, localizada na rede global da RTE-T, com um comprimento total de 11,98 km. Esta circunvalação foi concebida como uma estrada sobre os parâmetros técnicos e funcionais de «S», com uma nova área de implantação no lado norte e leste da cidade e na comuna de Szczecinek. O desvio projetado apresenta uma secção transversal bidirecional com duas faixas (2x2), uma fa...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

24 October 2022

13 August 2022

  • curprev 17:2617:26, 13 August 2022DG Regio talk contribs 77,365 bytes +48,690 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1221:12, 30 November 2021DG Regio talk contribs 17,560 bytes +2,899 Created claim: summary (P836): Ce projet couvre la construction du contournement de Szczecinek le long de l’autoroute S11 située dans le réseau global du RTE-T, d’une longueur totale de 11,98 km. Ce contournement est conçu comme une route sur les paramètres techniques et utilitaires «S», suit une nouvelle trace sur les côtés nord et est de la ville et de la municipalité de Szczecinek. Sur le périphérique prévu, il y a une section à deux voies avec deux voies (2x2), une voie d...
  • curprev 21:1221:12, 30 November 2021DG Regio talk contribs 14,661 bytes +122 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 14,979 bytes +110 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 14,869 bytes −108 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 14,977 bytes +2,463 Created claim: summary (P836): This project covers the construction of the Szczecinek bypass along the S11 expressway, located in the TEN-T comprehensive network with a total length of 11.98 km. This bypass was designed as a road on the technical and functional parameters of “S”, running a new footprint on the north and east side of the city and the Szczecinek commune. The designed bypass features a two-way cross-section with two lanes (2x2), a dividing belt and an emergency...
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 12,514 bytes −2,118 Removed claim: summary (P836): This project involves the construction of a bypass of the city of Szczecinek during the S11 expressway, located in the comprehensive TEN-T comprehensive network with a total length of 11.98 km.The bypass in question has been designed as a road on the ‘S’ performance of technical and commercial parameters, a new trace after the north and east of the town and municipality of Szczecinek.The planned ring road is provided with dual carriageways wit...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0110:01, 4 March 2020DG Regio talk contribs 12,923 bytes +2,118 Created claim: summary (P836): This project involves the construction of a bypass of the city of Szczecinek during the S11 expressway, located in the comprehensive TEN-T comprehensive network with a total length of 11.98 km.The bypass in question has been designed as a road on the ‘S’ performance of technical and commercial parameters, a new trace after the north and east of the town and municipality of Szczecinek.The planned ring road is provided with dual carriageways with...

18 February 2020

8 February 2020

31 January 2020

14 January 2020