Revision history of "Extension of al. 29 November on the section from ul. Opole to the border of the city of Krakow" (Q85932)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 October 2024

  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 50,776 bytes +1 Changed label, description and/or aliases in pt
  • curprev 22:2422:24, 12 October 2024DG Regio talk contribs 50,775 bytes +5 Set a claim value: summary (P836): O projeto inclui a extensão do Al existente. 29 de novembro (de St. Opole até à fronteira da cidade) numa extensão de cerca de 2,6 km com reconstrução de instalações de engenharia, ampliação, reconstrução e construção de infraestruturas: armas de desidratação, de iluminação, de sinalização luminosa e de colisão. O percurso previsto coincide com o percurso da rua existente. O projeto proporcionará uma capacidade de carga de 115 kN/eixo. O principal o...

7 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 48,015 bytes +11 Changed label, description and/or aliases in da, it, sk, de, hr, ga, bg, fi, et, el, pt, sv, lv, cs, es, fr, ro, nl, lt, hu, sl, mt, and other parts

24 October 2022

13 August 2022

  • curprev 17:2617:26, 13 August 2022DG Regio talk contribs 47,194 bytes +27,597 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1221:12, 30 November 2021DG Regio talk contribs 13,616 bytes +1,383 Created claim: summary (P836): Le projet comprend l’extension de l’actuel Al. 29 novembre (à partir de ul. Opolska aux limites de la ville) à une longueur d’env. 2,6 km avec reconstruction de structures d’ingénierie, extension, reconstruction et construction d’infrastructures: déshydratation, éclairage, feux de circulation et bras de collision. L’itinéraire prévu coïncide avec l’itinéraire routier existant. Le projet assurera une capacité de charge de 115 kN/essieu. L’objecti...
  • curprev 21:1221:12, 30 November 2021DG Regio talk contribs 12,233 bytes +158 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 12,515 bytes +153 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 12,362 bytes −158 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 12,520 bytes +1,336 Created claim: summary (P836): The project includes the extension of the existing Al. 29 November (from St. Opole to the border of the city) on the length of approx. 2.6 km with reconstruction of engineering facilities, extension, reconstruction and construction of infrastructure: dehydration, lighting, light-signalling and colliding weapons. The planned route coincides with the existing street route. The project will provide a load capacity of 115 kN/axis. The main objective...
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 11,184 bytes −856 Removed claim: summary (P836): The project includes the extension of the existing Alone.29 November (from ul.Opolskie to the city’s borders) over a period of around2.6 km with reconstruction, extension and construction of infrastructure:dehydration, lighting, light-signalling and conflicting arms.The planned route is to coincide with the existing route of the street.The project will provide a load capacity of 115 kN/axle.The main objective of the project is to increase the...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0110:01, 4 March 2020DG Regio talk contribs 10,325 bytes +856 Created claim: summary (P836): The project includes the extension of the existing Alone.29 November (from ul.Opolskie to the city’s borders) over a period of around2.6 km with reconstruction, extension and construction of infrastructure:dehydration, lighting, light-signalling and conflicting arms.The planned route is to coincide with the existing route of the street.The project will provide a load capacity of 115 kN/axle.The main objective of the project is to increase the tr...

18 February 2020

8 February 2020

31 January 2020

14 January 2020