Revision history of "Reconstruction of national road No. 12 within the administrative boundaries of the city of Chełm" (Q85929)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

24 October 2022

13 August 2022

  • curprev 17:2617:26, 13 August 2022DG Regio talk contribs 43,632 bytes +24,913 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:1221:12, 30 November 2021DG Regio talk contribs 13,230 bytes +1,244 Created claim: summary (P836): Le projet concerne la reconstruction de la route nationale no 12 à l’intérieur des limites administratives de la ville de Chełm. Le champ d’application du projet comprend la reconstruction du tronçon urbain DK 12 à Chełm avec des trottoirs et des routes d’accès. L’objectif du projet est d’améliorer l’interconnexion dans le corridor germano-polonais-Ukraine (la section se trouve dans le réseau RTE-T)., translated_summary
  • curprev 21:1221:12, 30 November 2021DG Regio talk contribs 11,986 bytes +170 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 12,256 bytes +156 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 12,100 bytes −155 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 12,255 bytes +1,218 Created claim: summary (P836): The subject of the project is the reconstruction of national road No. 12 within the administrative boundaries of the city of Chełm. The scope of the project includes the reconstruction of the urban section of DK 12 in Chełm with pavements and access roads. The aim of the project is to improve the connection in the corridor Germany – Poland – Ukraine (the section lies in the TEN-T network)., translated_summary
  • curprev 14:5514:55, 14 October 2020DG Regio talk contribs 11,037 bytes −743 Removed claim: summary (P836): The purpose of the project is to rebuild national road No 12 within the administrative boundaries of the town of Chełm.The scope of the project includes the redevelopment of the DK 12 urban section in Chełm, along with pavements and access roads.The project aims to improve the connection along the German — Poland — Ukraine (section of the TEN-T network) corridor., remove_old_english_translation

15 July 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0110:01, 4 March 2020DG Regio talk contribs 10,058 bytes +743 Created claim: summary (P836): The purpose of the project is to rebuild national road No 12 within the administrative boundaries of the town of Chełm.The scope of the project includes the redevelopment of the DK 12 urban section in Chełm, along with pavements and access roads.The project aims to improve the connection along the German — Poland — Ukraine (section of the TEN-T network) corridor., Adding English summary

18 February 2020

8 February 2020

31 January 2020

14 January 2020